Hi guys,
I was notified by my builder that upon excavating and erecting piers, they hit a clay domestic sewerage line. This has caused the pipe to crack. The builder has asked me to fork out the costs to replace the pipe (which includes plumber costs and excavation costs - removal and disposal of soil).
Is this right?
Thanks!