Browse Forums General Discussion changing layout 11Oct 17, 2008 10:48 pm Definitely agree with the previous 2 comments. Layout change can mean structural change, which will affect roof structure especially in a double brick construction. If this is the case, you will need to get a revised tender.
You can definitely change any layout before sign of contract, however, it is recommended to talk to your designer & engineer before signing contract. Zouk Architects P 1300 662 028 F 02 8456 5952 E info@zoukarchitects.com.au www.zoukarchitects.com.au How much are you ahead in payments compared to where the build is at? Have you fully drawn down the loan? 5 11917 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105564 Hi I am wanting some opinions about the build of a steel shed I am going to get one about 4.5 x 2.5 m steel shed and the height will be about 2.3-2.4m high The one I am… 0 14442 |