Hi there,
i wanted to know if there was anyone who has been able to ask the builder to do any changes in the floor plan after having signed the PPA?
In saying that, it clearly mentions on the form that no changes can happen after signing it, but obviously as can I read in a lot of previous posts, I am feeling a bit of the buyer's remorse as well. I thought I had done all my research before signing the papers, but as I have started designing the house on a 3D program, I realised a few things that the sales rep (Aussielivinghome in this instance for me) didnt mention. I wanted to change the ensuite bathroom to allow for more space, but as everything else it was going to cost money. I have cancelled the plan they had done for me for the ensuite due to the cost and not really achieving what i wanted, but now after drawing it all up, i managed to find a solution. Has anybody been able to talk to the builder at time of construction to modify 1/2 of a wall length, non structural as well?