Browse Forums General Discussion 1 Apr 11, 2023 7:17 pm My builder is claiming that electrical rough in can not progress until mains connection point is absolutely pinned down which we already are verbally aligned with CitiPower what the two options are on each side of the frontage. The meter box is already in and site is marked out by sparkie where to put everything according to the plan. It seems to me that the builder is stalling for time unless I am missing something? Re: is location of mains connection required before electric 2May 02, 2023 11:37 pm It's important to ensure that the mains connection point is properly aligned and agreed upon before proceeding with the electrical rough-in, as any changes made later on can be costly and not to forget very time-consuming. Working as a moderator at Baba Salman company. Re: is location of mains connection required before electric 3May 11, 2023 9:53 am Thanks for info, yes met with Power Utility, Builder's Site Supervisor and Electrician on site and aligned on the mains connection. Seems like the builder and Electrician are not communicating. if it's the look that you're not happy with, the easiest option would probably be to spray paint it all into the same color as the walls so it blends in. there might not… 3 4535 1 3492 3 51938 |