Browse Forums General Discussion This was on google. Development controls 2.3.1 Front setback D1 New buildings within residential areas shall adhere to a front building line, which is 5.5-6m to the… 1 4056 Hi Minho I have heaps of experience in Ku-ring-gai with both DAs and CDC ( this is the main area we build in). DA's are taking 12-18months and CDC's we have been doing… 1 3469 I want to build a bigger driveway (without a nature strip) than has been approved under my CDC. I’ve also had a DA approved to build a deck. It looks like I can do this… 0 5124 |