The slab is down, and we now have a fence around the building site.
The plumber returned and has placed all the storm water pipes in ( sealed system via tank) and also put the grinder tank in down the side of the house.

Pleased how level the site is now it’s been back filled.

We have still have not heard from the site supervisor who takes over from Slab supervisor. It would be good to know where too from here.



Our frame arrived sooner than expected. We have been told it will be erected after Christmas. Roof and bricking to commence mid January.

Related
6/07/2023
2
Hebel Flooring PLUS Insulation or Not?

General Discussion

1000000% definitely add insulation. I have in my home and it makes a big difference minimising sound transfer. Insulation is pretty cheap and definitely worth it

16/04/2024
0
Hardie Linea Vs BGC Nuline Plus

Building A New House

We are building a house that was planned to be clad in Hardie Linea, our builder has now requested to swap this for BGC Nuline Plus. They look fairly similar and he has…

14/12/2023
14
So many builders going bust, how's King homes/Fowler homes?

Building A New House

I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with…

You are here
Building ForumBuilding A New House
Home
Pros
Forum