Its been a while since I've posted.. But things are finally getting real! Since my last few posts, we've got Prestart out of the way! It was only 3 hours long (maybe even less)! Our prestart lady was really impress as it normally goes longer she says :S I was just happy that we were prepared as much as we can.. Thank you to everyone that answered my questions in the past, they have helped me out so much!!
So.. As some of you may know, we're building The Maxum wuth New Generation Homes, and we are also signed up for "The Fasttrack Guarantee" (if anybody has signed up for this too, let me know how you went!) There's really nothing much that we changed in the floorplan as we loved it as is! It may seem small to others but I think it'll do us just fine:) The only things we did is add doors and upgrade stuff in the kitchen (YAY!)
Things to do after handover: flooring, paint, glass splashback for kitchen and LED lighting (it seems like a lot for me to handle but i'm sure we'll get through it haha)
The block.. is only 420sqm, in Haynes, in a new estate called Springtime! There's 3 villages, and we're in the Xavier side! We originally wanted to settle in Piara Waters/Harrisdale/Southern River but land is so expensive
Selections! I will try to post pictures but I really doubt I can cos my phone died a couple days ago and I'm not sure how to retrieve all of it! So I'm just going to list our selections for the time being
Exteriors:-
Roof: Colorbond Windspray, Gutters and Fascias: Basalt Main Render: Solver Dawn Grey, Contrast Render: Solver Charcoal. Garage: Colorbond Shale Grey, Paving: Brikmaker Vistapave Stormcloud for main and Seamist for trimming. Trying to achieve the Light/Dark Grey house, *fingers cross* it'll turn out okay >_<"
This is the Maxum, ours will be flipped though..
This is our front elevation..
This isnt our house, but its got the colours we want (except the feature and main wall colours)
http://colorbond.autech.com.au/onlinevi ... 1i227aai7i
This is our floorplan..
Paving: I like the little speckles in the brick, I personally think it makes it look nicer
Storm Cloud
Seamist
Interiors:-
We're going to have a paint party! and we're just gonna paint everything white, wait a few years for the cracks to come in and then paint colors
Kitchen:-
H1 helped me so much with this! boy do I love revisting the "show me your kitchen" thread over and over again! haha.. A couple of posts ago I asked about colour selections in the kitchen and I'm glad to say that for benctops we're going: Essastone Galileo (20mm) and for cabinets we're going: Laminex Polar White in the Silk Finish. Originally we wanted the crystal finish but then i weigh pros and cons and I picked silk (so much cheaper btw). My husband allowed me to upgrade stuff in the kitchen but not too much
Example of Laminex Polar White in Silk Finish:
Essastone Galileo:
Tiles:-
We're only doing full height tiling in the ensuite and bathroom (not in W/C or L'dry). Thanks to Kayla from Crosby Tiles (Osborne Park), she helped us choose our tiles and cabinets and were estatic with HER service (we went there 3 times and on the third time she helped us a great deal, does help that she's an interior designing student)..
Ensuite: Benchtop: Formica Opal Grey, Cabinets: Formica Burnt Strand. Wall Tiles: Crosby's Fashion White and Fashion Black. Floor Tiles: Crosby's Belga Charcoal.
Main Bathroom: Benchtop: Formica Baikal, Cabinets: Laminex Chalky Teak. Wall Tiles: Crosby's Fashion White and Fashion Haze. Floor Tiles: Crosby's Belga Grey.
Flooring:- We're getting a friend of a friend to do it. We've chosen Quickstep Readyflor Spotted Gum 1 Strip (in main living areas, including hallways and theatre), and Black Grey carpets (in master suite, bed 2, 3, 4, and study).
Theatre:- We're upgrading the theatre doors to cavity sliders
Shelby
Lockwood Cavity Sliding Door locks 7410
Thats it! sorry for the long post, but so much to update on
PICTURE for proof of evidence that we got dirt
____________________________
Timeline:
26.02.2014 - Signed with Builder
03.03.2014 - Deposit for Block
31.05.2014 - Signed PPA
29.08.2014 - Prestart
04.11.2014 - Signed Final Plans
14.11.2014 - Titles dued
28.11.2014 - Titles released
12.12.2014 - Land settlement applied
09.02.2015 - Certification of titles
09.02.2015 - MRA approvals applied
09.03.2015 - MRA approvals approved
16.03.2015 - Building permits received
19.03.2015 - Site Works commenced
27.03.2015 - Site Works completed
14.04.2015 - SLAB!
22.04.2015 - Soakwells installed
29.04.2015 - Bricks delivered
04.05.2015 - Brickwork commenced
22.05.2015 - PLATE HIGH!
26.05.2015 - Floating
01.06.2015 - Roof commenced
05.06.2015 - Timber frames installed
06.06.2015 - Electrical & Plumbing
26.06.2015 - Roof completed
08.07.2015 - Render commenced
17.07.2015 - Render & Ceiling
30.07.2015 - White set completed
31.07.2015 - Windows installed
31.07.2015 - LOCK UP!
03.08.2015 - Doors installed
06.08.2015 - Cabinets installed
10.08.2015 - Waterproofing & Shelvings
17.08.2015 - Grano
18.08.2015 - Tiling commenced
30.08.2015 - Tiling completed
03.09.2015 - Plumbings finalised
03.09.2015 - Pavers
10.09.2015 - Garage door installed
15.09.2015 - Renders and Internals
17.09.2015 - Elec Appliances installed
21.09.2015 - Blinds installed
23.09.2015 - House cleaned
25.09.2015 - Termite treatment
25.09.2015 - PCI
07.10.2015 - PCI items completed
09.10.2015 - KEYS!!
10.10.2015 - Painter commenced
11.10.2015 - Mailbox installed
12.10.2015 - Paint completed