Need Suggestion about building our new house with Eden Brae
Page 1 of 1
I am building my new house with EB. We decided to built Manchester 22 (single story). It was in our budget and also we are only two person, don't need a huge house as our first home. We wanted to add ducted aircon in our package but it's not included with our house. EB gave us quote for $10,800 for Actron 11.5kw.
I have checked with couple of company and one of them gave me quote for $7800 Actron 13kw. It includes everything and 5yrs warranty. Few of my friends told me to install ducted air con after handover. Single story much easier to install ducted than double story.
I need help with decide whether i should go with EB to spend $3000 more or do it by myself with outside company as both giving same brand air con. plz help!!!
One thing to bear in mind is that if you have ducted heating you should be able to use the same ducts as long as you pay the builder to get the size increased.
Does anyone have idea about cost of timber flooring. As our house comes with tiles and carpet in bed rooms. We want to upgrade to timber floor throughout the house.
Our air con package was $1 when we signed up... Having seen the whole process going in during construction. I would get it done. Even paying the amount you have been quoted. Depending on what roof you get, We got tiles... You wouldn't want your sarking ruined during installation with another company. They have to lift major/ heavy equipment into our roof. Paintwork could be ruined. This process gets done before gyprock when in construction.
I have found post handover there are lots of things you need to stay home for... If you are like me, I also had to clean up my old house and now put it in the market. I have spent the last two weeks on leave most often stretching myself between two properties. We haven't got a clothesline in yet, landscaping still to do. Think about moving costs, insurance, connection fees for phone, letterbox, new furniture, blinds... Depending in when you due to move in, it may be one less thing you have to worry about.
You have already mentioned getting flooring done post handover. Again, I would talk with the sales staff at Di Lorenzo. They will negotiate prices... We upgraded carpet and got the better underlay thrown in. Cause then you need to think about floor level in kitchen and skirting throughout home, we had marks on he skirting from laying tools but because it was done in the build. Our SS organised the painter to do touchups.
In the end it is your decision, but for convenience sake I would recommend getting it as part of the build.
Related
5/04/2024
1
I built with EB back on 2009. Check out this thread on this forum. viewtopic.php?f=31&t=12911&p=154061#p154061 I can't speak for recent expericience however, we had no…
29/09/2023
2
No the fireplace doesn’t work. It’s been enclosed. I’m not sure what was removed, as it was done quite some time ago - well before what I can see with photos online…
15/01/2024
0
I have a really long hallway which is 1100mm W x 11500mm L I would appreciate if anyone can give suggestions to light it up with Linear LED lights that goes from wall to…