Red Ink Home Avonlee Private Estate
Page 1 of 1
We wanted to share with you all of our New Journey.
Hope you enjoy the Journey as much as we do.
Floor Plan
Elevation
thats pantry looks huge....
I look forward to following the progress.
looks good. pretty exciting time.
can i just ask a quick question...we are also building with redink, and just wondering how long yr plans were in drafting....ours have been there about 3 1/2 weeks. how long did it take to get yours?
We have made a few changes since the start of it all with the Sales Consultant and also when we did Pre-Start some time ago.
I would say three to four weeks in drafting would be accurate.
Which version are you building and whereabouts?
were building a sort of a version of the Entertainer, down in Lake Clifton. so we are also having to add on the cost of rainwater tank and ATU system, which is going to be about an extra $20000.
i just cant wait to get going....this is a horrible stage of knowing that stuff is going on 'behind the scenes' but not being able to see anything for it
Pics for all of you to view.
http://img407.imageshack.us/img407/2226/img0038sn.jpg
http://img844.imageshack.us/img844/8647/img0037fd.jpg
http://img838.imageshack.us/img838/8657/img0027no.jpg
http://img690.imageshack.us/img690/1831/img0036hhy.jpg
http://img843.imageshack.us/img843/89/img0035yck.jpg
http://img406.imageshack.us/img406/4204/img0034uk.jpg
http://img11.imageshack.us/img11/2927/img0033dx.jpg
http://img811.imageshack.us/img811/6907/img0032id.jpg
http://img836.imageshack.us/img836/3921/img0031sif.jpg
http://img845.imageshack.us/img845/6905/img0030dfu.jpg
http://img824.imageshack.us/img824/232/img0029cth.jpg
http://img846.imageshack.us/img846/8740/img0028th.jpg
Blink and u will miss it, ours was 5 mths from slab to handover, had no issues from start to Finnish!
Beautiful home and AWESOME SS
drafting can take up to 4 weeks, check and double check your plans when they come back, we picked up a few Minor things (I think we had about 12 addenda's lol!!)
our build was a relatively stress free process and would recommend redink to anyone!!
All the prestart has finished and were all go for the build. (We only has about 10 changes as we really did a lot of work at pre-start meeting)
Will keep you all posted as this build develops.
We were wanting to go with RedInk originally but unfortunately they do no accept Keystart customers
You're not too far from my block!
Hope that it will all go smoothly.
Have had a slight delay due to the Window Frames, but thats cool.
Hopefully they will start the bricks soon.
Funny enought the Red Ink home next door will have the same brikies for us.
Our site supervisor has been approachable and happy to assist whenever he can. We have had issues sorted out as we go so this helps reduce the amount of time at the end fixing up and mistakes etc.
The only thing that could have been better was having the prestart sooner, so we could get moving a little earlier. But that is being picky!!
Very Happy and hopefully we will be in sooner than we expected.
Thanks REDINK!!!
Have our 6 Month inspection done very soon have a few things that need to be looked at which are not serious at all
Have our 6 Month inspection done very soon have a few things that need to be looked at which are not serious at all
Related
18/09/2023
0
I’m restoring all my 40yr old windows and I want to install seals around the casements. I’ve sanded back and oiled the frames with sikkens. My plan is to box up inside…
17/06/2023
0
Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m…
13/07/2023
12
If you already have a contract, is the inspection cost stated in there? If not they would be forced to issue you a variation which you could of course object to.