We have prestart booked 6th march and am freaking out that we are not going to be able to do what we want due to costings being soo high. We have already added $20,000 to the house already
REDink Prestart Costings - Please help
Page 1 of 1
We have prestart booked 6th march and am freaking out that we are not going to be able to do what we want due to costings being soo high. We have already added $20,000 to the house already
hope someone has some numbers as i will be watching this closely as we are hoping to get to prestart by end of march with RI.
Make sure at pre start u get them to put extra conduit at each switch as it makes it easier to upgrade lights to fans post handover
Also get extra tv points as this is much easier for them to do while building
I also recommend putting a PowerPoint in the roof space near the manhole (and place the manhole in the garage if u can)
Their standard range is quite good, and u have quite a lot to choose from!
One other thing, add a $10000 pre start allowance to your contract if u can, then u don't have to find the extra funds at handover if u spend more than u plan, and if u don't spend it you will get that put in your account once the construction loan turns into a normal loan
Does anyone know how much it costs to raise the ceiling in the garade from 25c to 28 c?
We spent around the 10k mark in prestart. just over 3k alone in the electrical plan.
Anyone else have any other pointers..... I am wondering what it will cost to get full render on the front of the house?? any ideas
I was quoted a little while back 1450 on the front render if that helps
prices may have changed by now though
But I would think around the $1500 dollar mark. maybe slightly less.
As for high gloss, our kitchen was about $700 extra and bathroom about 200 ensuite 300 ish to upgrade!!
as a bit of a guide our elec changes cost us 1700 however this includes all light switches with dimmers,
all double gpo's, about 10 extra gpo's, 4 TV points with data next to them, and a few extra lights outside.
oh and a 40 amp single phase power outlet for our spa outside
a couple of the big ticket items were our splashback which was an extra 600 or so, (600x300 tiles)
changing the alfresco from 25c hardiflex to 28c recessed plasterboard with the eaves 25c (just over 2k)
Wow I link the prices of your upgrades. I am going from whatever the standard height is to 32c upper floor and 35c ground floor and I am being charged around 22K. Render for the sides and rear (front is included) is 18K. Upgrading from laminate master ensuite, guest ensuite and kids ensuites plus stone in powder room is 6.8K>
I am querying everything but it is sure mounting up.....
Glad I have seen this thread.
Ciao
Mark
Thanks in advance
Cheers
Mark
HI All, just wondering how much redink will charge for waterfall edges to our kitchen island and extend to add a breakfast bar.. we have the free essastone bench tops... Also we are only allowed to pick from the formica range for our cabinetry.... just wondering if it is very expensive to upgrade to like super gloss or polyrey
Our waterfall end was about the $1100 mark.
In regards to your ceiling upgrades ..what is your area for the lower and upper floors for your high celings?Looking at upgrading too!
Cheers
Jason
CC101.... for the 5k what is that getting you. I have not even considered electrical so i would be keen learn what additional stuff costs. I will put more GPOs and will what some dedicated 20amp lines for amps etc....
Thanks in advance
Cheers
Mark
Thanks in advance
Cheers
Mark
no down lights. 2 gas points, 2 tv points, flumed exhaust, few conduits, extra lights and powerpoints in and outside. it still took us to 5k approx.
PM sent, did not want to derail the thread.....
Related
3/12/2023
0
Hi Everyone, wondering if anyone has done a prestart lately with summit homes in WA and what kind of costs were associated with adding gpo's and downlights? we are also…
19/11/2023
1
All 3 items listed are defects and are of concern. Please seek qualified independent inspector and/or legal advice for your state.
28/01/2024
2
Thank you @. Tried to play with the facade models but the exact colour is not matching up.