Now we are trying to go through another builder (Simonds Homes). Now they seem really good and reasonable. At the beginning we got them to do a estimate on the soil testing we had already. For a 20.6 sq home they estimated $13,500 which we thought was alright. They called us in to look at the final contract with the soil test they had done, they claimed that now it had fill and was class P so now we are at the other end of the scale.
How could soil tests on the same property be so different?
We have sent them out there again to do a second test through a different company.
Has anybody else had this type of drama?
We have sent them out to do a second lot of soil testing. But is it actually possible for the tests to change that much?
Its quite annoying.
Annie
You said that Simonds initially estimated 13.5 k but you didn't mention their second cost, just that it was more expensive and they classified P.
Have they classified the soil as P or the site? There is a difference. If you have fill, the site will be P but the soil may not be. Do you need piering because of the fill? This could be the extra cost.
You mentioned you have fall, if you need a considerable cut and fill you may also need piering.
Also when the initial soil test was conducted, was the land settled? Or still being developed?
The second cost was roughly about 20k. They have stated that the soil is class P and that we will need Peirs not for the fall we don't even need retaining walls . But our previous soil test say we are M (which is their standard inclusion) and the soil is Silty Clay not fill. Also the land had settled before they did the soil tests so there could not of been any change. Clay and fill there is a big difference.
How big is your fall?? What will the cut and fill be if any? We need piers but not retaining walls so they don't always go hand in hand.
Speak to your land developer. They should be able to provide something to say there is no fill on the block if there isn't. Then take that documentation to Simonds and ask them to explain how they have come to the conclusion there is fill.
Is there any possibility, that somewhere along the line the wrong block has been tested and that's why there's a discrepency?
The fall is roughly about 1.4m and they will be cutting and using the dirt they cut to fill the rest so no dirt will needed to be brought in. The reason we don't need retaining wall is our block is large enough to spread things out (26.72 x 30.75m) 816sqm. They have told us the whole procedure and we have asked all the questions. The site costs weren't the trigger for us to be unhappy its the fact that the soil test were so different. How can our block go from silty clay to fill dirt cannot change itself.
Ok, so if you're not worried about the site costs and you are comfortbale with the figure they've come back with what exactly is the problem?
I must be missing something because I'm confused about what the actual problem is then because your thread is titled "Site Costs" so that would suggest that the amount is the problem.
Related
17/04/2024
1
Henley should give you some indication of site costs. Too many variable to give you any reasonable accuracy
18/06/2023
0
Looking to tile the facade pillars rather than rendering. Builder is quoting 2500$ laying cost for upto 10msq. The 2 pillars come to be 16msq. So laying costs are 5000$…