This is our second home build so posting here our journey with Astoria Grand 55.
Anyone else is building Astoria Grand 55?
Couple Things from our upgrades:
High ceiling 2.74 on ground floor and 2.74 on first floor. Hopefully won't get issue with the overshadow things.
Classique Facade with Hebel.
Double Glazed Windows/ Doors.
Convert Downstairs Lounge into one master bedroom
Kitchen Caesarstone Cat 3 with 80mm Dropdown Waterfall on the Island Kitchen
Chevron Timber Floor after build.
Garage 1m Extension.
Refrigerated Cooling
Jetmaster SL-5X fireplace
Black Kitchen Sink/ black bathroom tapware.
Timeline:
03 Aug 2021 - First Deposit
07 Aug 2021 - Second Deposit
31 Aug 2021 - Submit Underground Power Pit application to Citipower.
18 Sep 2021 - Colour Browse Appointment - Cancel as lockdown.
27 Sep 2021 - Underground Power Pit got installed.
28 Sep 2021 - Request electricity abolishment
05 Oct 2021 - Electricity Abolishment Completed
05 Oct 2021 - Apply for Asset Protection
07 Oct 2021 - Colour Selection Appointment
21 Oct 2021 - Tender
Couple Things to decide
- Adding door to master ensuite of master bedroom or leave it open.
- Adding door to theatre room or leave it open.
- Square set cornice or classic cornice.
- Entrance Door Selection between solid timber of wrough iron door after build
How are you going so far? Do you have any pics of your plan and colours?
Hi, I updated colours at our instagram
https://www.instagram.com/cteafamily/
Feel free to follow. Hope it’s useful.
Our Build Journey: https://www.instagram.com/cteafamily/
******************************************************************
Tender 21 Oct 2021
Signed tender 11 Nov 2021
******************************************************************
Our Build Journey: https://www.instagram.com/cteafamily/
******************************************************************
Hi everyone,
This is our second home build so posting here our journey with Astoria Grand 55.
Anyone else is building Astoria Grand 55?
Couple Things from our upgrades:
High ceiling 2.74 on ground floor and 2.74 on first floor. Hopefully won't get issue with the overshadow things.
Classique Facade with Hebel.
Double Glazed Windows/ Doors.
Convert Downstairs Lounge into one master bedroom
Kitchen Caesarstone Cat 3 with 80mm Dropdown Waterfall on the Island Kitchen
Chevron Timber Floor after build.
Garage 1m Extension.
Refrigerated Cooling
Jetmaster SL-5X fireplace
Black Kitchen Sink/ black bathroom tapware.
Timeline:
03 Aug 2021 - First Deposit
07 Aug 2021 - Second Deposit
31 Aug 2021 - Submit Underground Power Pit application to Citipower.
18 Sep 2021 - Colour Browse Appointment - Cancel as lockdown.
27 Sep 2021 - Underground Power Pit got installed.
28 Sep 2021 - Request electricity abolishment
05 Oct 2021 - Electricity Abolishment Completed
05 Oct 2021 - Apply for Asset Protection
07 Oct 2021 - Colour Selection Appointment
21 Oct 2021 - Tender
Our Build Journey: https://www.instagram.com/cteafamily/
******************************************************************
Hi everyone,
This is our second home build so posting here our journey with Astoria Grand 55.
Anyone else is building Astoria Grand 55?
Couple Things from our upgrades:
High ceiling 2.74 on ground floor and 2.74 on first floor. Hopefully won't get issue with the overshadow things.
Classique Facade with Hebel.
Double Glazed Windows/ Doors.
Convert Downstairs Lounge into one master bedroom
Kitchen Caesarstone Cat 3 with 80mm Dropdown Waterfall on the Island Kitchen
Chevron Timber Floor after build.
Garage 1m Extension.
Refrigerated Cooling
Jetmaster SL-5X fireplace
Black Kitchen Sink/ black bathroom tapware.
Timeline:
03 Aug 2021 - First Deposit
07 Aug 2021 - Second Deposit
31 Aug 2021 - Submit Underground Power Pit application to Citipower.
18 Sep 2021 - Colour Browse Appointment - Cancel as lockdown.
27 Sep 2021 - Underground Power Pit got installed.
28 Sep 2021 - Request electricity abolishment
05 Oct 2021 - Electricity Abolishment Completed
05 Oct 2021 - Apply for Asset Protection
07 Oct 2021 - Colour Selection Appointment
21 Oct 2021 - Tender
If you don't mind me asking, how much was it to change upstairs to 2.74m ceilings? We are currently doing colour selections for our Astoria Grand 55 and have been debating on whether to increase the Level 1 ceiling height.
Related
24/01/2024
0
Any advice on how to ensure the kit home granny flat that im thinking of buying will get council approval. The kit home companys wont release plans without a deposit and…
24/04/2024
4
Carlisle use to sneak a water resistant "Performance Solution" into their contracts. Have you checked your contract for same?
21/02/2024
7
Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing…