Yep it only took them 2 weeks and 3 days in this crap weather so I guess it would have been quicker if we had nice weather. Celebrations sent us a letter saying they expect it to take 4 weeks
so excited to walk through it.
Any updated photos tezza?
All brickwork is done now isn't it?
P.S. think I saw your photo on the CH facebook last week.
Yeah I'll have photos today going out to look. The roof frame and eaves have been done. Yes my photo was on the celebration facebook page. I'm pretty sure I've figured out who you are on facebook lol
Yeah I'll have photos today going out to look. The roof frame and eaves have been done. Yes my photo was on the celebration facebook page. I'm pretty sure I've figured out who you are on facebook lol
Its just flying along for you isn't it haha!
Any updates this weekend tezza?
oh and there were a couple of issues that the builder is due to fix up this week
http://i1290.photobucket.com/albums/b533/tezza_87/20130831_144900_zpscd405e02.jpginside the garage
http://i1290.photobucket.com/albums/b533/tezza_87/20130831_145440_zps78b3d0c3.jpgthe gutter appears to slant down
but celebration homes have been great and went down on site to have a closer look its good to know reporting any issues with them is easy and not a big headache.
Apart from those few issues it is looking awesome tezza
That's a lot of smart wiring haha!
well a lot has happened. they have fixed the issues but my partner isn't to happy with them
a small hole in the garage yeah its only small but it has to be fixed
our colorbond roof
this was taken earlier this week looks good
then a nice surprise the glass for the windows have been put in
living area all grey float finished
its really looking like a house hopefully the ceiling and cornices will be done next week then white set and lock up then I can really get a feel for the size
white set is almost finished but still no ceiling. they seem to be doing it all backwards compared to other builds ive seen. I thought generally it went 1st grey float, 2nd ceiling, 3rd white set then 4th windows ? but ours went grey float, then windows, then white set and im guessing ceiling last.
white set is almost finished but still no ceiling. they seem to be doing it all backwards compared to other builds ive seen. I thought generally it went 1st grey float, 2nd ceiling, 3rd white set then 4th windows ? but ours went grey float, then windows, then white set and im guessing ceiling last.
Yeah, i guess its as things become available, we have been told our roof cover will go on this week, usually the electricians and plumbers come out before the roof cover goes on? Only time will tell but as long as it keeps moving in the right direction is the way I try and look at it
It looks pretty damn good from the street!!
your cabinets look like they are the same colour as the ones in my ensuite
sooooo nice!! have you been given an indication of a handover date?
Thanks I think it's turned out great.
The cupboards are iron ore Kat. I saw them in a display home and loved them.
Nope no date yet have no idea when we will be in.
Thanks I think it's turned out great.
The cupboards are iron ore Kat. I saw them in a display home and loved them.
Bingo!! Same as us
had a lockup meeting on Monday just gone. it went really well and have booked pci for the 28th November
heres some photos I took on Monday
undermount sink
http://i1290.photobucket.com/albums/b533/tezza_87/20131028_080125_zpsf047c41b.jpgmy kitchen with stone bench tops installed. they put the wrong stone bench tops caerser snow instead of caeser ice snow but they a both really similar just finer specks through it and it does look really good so I didn't push the issue.
http://i1290.photobucket.com/albums/b533/tezza_87/20131028_080104_zpsd38ed5e6.jpgensuite shower tiled
http://i1290.photobucket.com/albums/b533/tezza_87/20131028_075920_zps65d6af24.jpgensuite tiled
http://i1290.photobucket.com/albums/b533/tezza_87/20131028_075909_zpsa2b2015c.jpgmain bathroom tiled. wish I knew about mitred tiles
http://i1290.photobucket.com/albums/b533/tezza_87/20131028_075825_zpse432a8c1.jpglaundry
THEN I went out Wednesday and found all of this
rangehood installed, toilets delivered, lights in, switched and power points started.
my awesome oven
garage floor poured
cant wait and im so happy we will be in for christmas
Looking great tezza! You wouldn't think the remaining items take 4 weeks lol!
getting very close to the end the last thing was blinds and they were installed on Sunday.
my partner went out and looked at the house on Monday and someone attempted to break in but weren't successful they did crack the back door near the deadlock but that should have been replaced. cant wait PCI tomorrow
Did they manage to get the door fixed tezza? When is your key handover booked for?