Third time's a charm ( our 3rd build @ Bingara Gorge )
Page 3 of 11
With xmas next month we probably wont see a start until early next year.
I can’t believe how slow things move these days when it comes to building, I don’t remember things being this slow on previous builds.
Nice open space. What's the average block size? Hope there will be some decent tree coverage.
Nice open space. What's the average block size? Hope there will be some decent tree coverage.
Over in Greenbridge East the majority of blocks are between 700 and 900
https://youtu.be/7My7OTJcN8E
Went for a drive yesterday to inspect the block as there was a request to have the grass cut in preparation for work to begin.
Took the opportunity to get the drone in the sky and get some footage. This was my 3rd flight so im still trying to get a feel for it.
Went for a drive yesterday to inspect the block as there was a request to have the grass cut in preparation for work to begin.
Took the opportunity to get the drone in the sky and get some footage. This was my 3rd flight so im still trying to get a feel for it.
Looks great! We have our electrical appointment coming up and have now idea how much additional cost I am in for. Are you able to share ballpark cost for this electrical design? Thanks!
We spent $13k at our electrical appointment, things add up really quick... i worked out how much i could of saved doing it after handover and it just was not worth the headache
Frame inspection report completed which went well, had one issue to report on which was the location of a drain for the wall hing vanity is protruding into the next room the wall backs onto.
Site supervisor has been informed and it will be rectified this week.
Related
15/08/2023
9
Well thats a relief! The whole family is sick of waiting.
21/05/2024
12
Congrats. Will be watching this progress and interested to see how you go with summit.
7/08/2023
1
how imperative is the timing of the answer?