Aegean 430 from mainvue - lockup stage pics added
Page 3 of 8
Will be doing mirror splash back too in the kitchen and butlers. Yours will look good, opens up the area heaps
I have changed the upper Windows to match the Hudson facade from Henley. Thought a picture window would look more appealing with the thicker frame
End result
Rear roof on
Plumbing fitted for shower. Niche pictured as well
Heater and ductwork in
Also, which room is the pic b4 the bath, with the window round the corner so to speak? Front room? Study/theatre maybe?
Also loooove the kitchen window, it's huge! They still do a bit of a splash back around it don't they?
The pic after the bath is my study (first room of the house)
Also the kitchen window will have a wall tower on the left, theres minimal splash back, think under 100mm per side.
Looks more think this
That's really nice. So u upgraded the upgrade? Lol. Was it expensive?
Do you know what size the study and theatre room end up being
Related
24/05/2024
1
Anyone have any ideas on time frame? - Our gyprock got delivered today and SS said it will be all installed by end of this coming week with waterproofing to be done a few…
20/06/2023
1
The fastest thing a builder will do is bank your cheque, those systems work perfectly with lightning speed, everything else is slow burn. Just the way it is.