Had electrical appointment today at Emu Plains. All appointments done now , next step is to organize when I should demolish my house and start the dreaded renting.
Ah I see. Its weird they separate it! We shall be prepared then Thank you...btw...where is the best place recommended to put these cat 6 things in? I was thinking the main place where hubby will have his game thingys
Not an expert on networking. Standard they offer is cat5e which is pretty good - we upgraded to cat6 because it wasn't that much more and it future proofs us. We put a data point in where we think we are having tvs / computers, also wherever your modem / router will be. We'll have a switch in the home hub. Hopefully if your hubby is into gaming, he'll know where they should be.
I drove past our site on Monday as I headed off with the kids to the Hunter Valley, and our SS is as good as his word, brickies back on site already....phew! Looking forward to finishing brickwork and seeing the roof go on over the next few weeks....!
Our block was pegged just before Masterton went on there break, so I am eagerly awaiting there return. Does anyone have a timeframe of when they will start building once the block has been pegged?
We were pegged on 8th Oct and excavation started on 14th Nov. Patience is definitely a virtue when it comes to building with Masterton!! Having said that there was work going on at our site today which was an unexpected surprise. It was also a shock to see a 4.5 ton excavator on the slab digging trenches for the plumbing
After much searching and many trips out to every Homeworld we could find, we have narrowed our choice down to the Villina Lane or The Braedise 33 from Firstyle http://firstyle.com.au/houses/Braeside33-rear.html
We've bitten the bullet and Firstyle are writing us up a tender & we are off to Warrick Farm on the weekend to get a tender organised on the Villina.
It was another episode in our education on builders when talking to Firstyle, even though they appeared more forthcomming on prices there were some Masterton inclusions we had to specifically ask for - like Granitguard termite treatment, treated timbers and R3.5 insulation bats (Firstyle standard is R1.5).
So now we've been careful to include everything in both tenders so that we can get a real comparison between them.
We've even ordered a skip for next weekend to start our pre-move out clearance of the detrituce - I think we're one the Woohoo side of the rollercoaster ride at the moment.
On another note, there's no gas pipeline in our street (or suburb for that matter) and I don't want the hastle of ordering in LPG bottles every few months, so solar panels & all electric cooking/hot water is looking good.
I've even found the gadget I need to divert unused solar power into the hot water system:
http://www.australianwindandsolar.com/immersun-products
Now I've just got to explain it to M and Firstyle so they can get us the right Basix score.
The adventure continues
Firstly i have been reading this forum now for about 2 weeks, and so far have found it invaluable.
I am just starting the process, and considering knock down rebuild to a duplex.
I think most of this information can still help me, but i was wondering if anyone has built a duplex with Masterton Homes before?
Thanks,
Muzza
We are about to start building with Masterton in Elizabeth Hills (modified Overtue Elite). Our block was pegged and fenced before the christmas break and we were told today that we are now in construction and they have 20 days to commence. Do they generally wait until the 19th day to commence or do they get straight into it?
Welcome elizabethHills, it all really depends. Some people are lucky to have constrution start straight away, others are not
I think he thought we would be upset about having to fix the fence, but we are going to replace it when building is finished, so he's just going to put temp fencing across it in the meantime.
Seriously, there was literally nothing to steal on site over Christmas...at least it wasn't just vandalism I guess..
On a bright note, brickwork is now the full two storeys high now which is super exciting!
Welcome Muzza and Elizabethhills2013.
Can't believe they stole from your site R2D2. At least there was no vandalism inside that would mean your build was delayed.
So M are back...can't wait to see all the building fun again! Appointments start for us tomorrow! Any last minute tips?
ElizabethHills2013 and Muzza02,
MGardz- enjoy your appointment tommorow you are very organised.
R2D2 - brickwork nearly done thats great at that rate you might be in mid year
i m building cello signed contrat and paid 5% on 18th dec.will be submiting external color tomorrow and hopefull process will start .
GOOD LUCK every one buliding and congrats to people who already moved in.
Related
28/07/2023
16
i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices
30/10/2023
0
Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section…