Okay. I'm not good with these things. How can I check this?
There should be a clear space around every penetration through your floor joists. When you walk on the floor above it will cause slight movement of the joists and if pipework is sitting on it it has the potential to squeak.
In addition have a good feel through your foil wrap for clear cavities behind your brickwork. It's something I wish I had of raised but they will cover it all up as quick as possible. Your brick cavities should not be filled with mortar.
Looks really good with the rendering done, you are powering along nicely can't wait to see the internal fittings.
We cant wait either. We are hoping to move in by Christmas. The SS says it will get close to that time however he cannot promise. My contract says 21st April though.
We are getting everything done (except window coverings and crimsafe) via Ausbuild, including driveway, all electrical and flooring.
When does your SS say about your timeframes?
Looks really good with the rendering done, you are powering along nicely can't wait to see the internal fittings.
We cant wait either. We are hoping to move in by Christmas. The SS says it will get close to that time however he cannot promise. My contract says 21st April though.
We are getting everything done (except window coverings and crimsafe) via Ausbuild, including driveway, all electrical and flooring.
When does your SS say about your timeframes?
That will be unreal if you can move in before Christmas, we are also hoping we can move in before that but our contract says end of March. My SS thinks late January is more realistic time frame for the house to complete, however there's a few things we are not doing through Ausbuild such as tiling and carpet for general areas and driveway so I'm hoping we still can make it before Christmas.
We currently getting our external cladding painted, that should be done by end of the week and also the guys are installing the cornices this week and I think our kitchen cabinetry are getting ordered this week as one of the guy was on site doing some measurements. I think both of us are pretty much on par in terms of progress, fingers crossed it goes smoothly for both of us till the end.
Looks really good with the rendering done, you are powering along nicely can't wait to see the internal fittings.
We cant wait either. We are hoping to move in by Christmas. The SS says it will get close to that time however he cannot promise. My contract says 21st April though.
We are getting everything done (except window coverings and crimsafe) via Ausbuild, including driveway, all electrical and flooring.
When does your SS say about your timeframes?
That will be unreal if you can move in before Christmas, we are also hoping we can move in before that but our contract says end of March. My SS thinks late January is more realistic time frame for the house to complete, however there's a few things we are not doing through Ausbuild such as tiling and carpet for general areas and driveway so I'm hoping we still can make it before Christmas.
We currently getting our external cladding painted, that should be done by end of the week and also the guys are installing the cornices this week and I think our kitchen cabinetry are getting ordered this week as one of the guy was on site doing some measurements. I think both of us are pretty much on par in terms of progress, fingers crossed it goes smoothly for both of us till the end.
Yes we seem to be almost at par, with yours still a bit ahead.
My SS also thinks late January is more realistic time frame for the house to complete.
Our cladding goes up this week and the painting will be starting next week. Also for us too the guys are installing cornices this week and the upper level feature bricks are being finished (should be done by Friday) and our kitchen cabinetry and vanities have been measured and ordered to go in on the 5th and 6th Oct. Then the following week we will have our tiling for the wet areas done.
Fingers crossed we get in by Christmas.
Related
15/02/2024
0
Hi, I contracted a Builder to do a Garage to Bedroom + ensuite conversion (Class 1a), the Builder engaged the Certifier and Engineer and received BDA from the Certifier…
5/09/2023
0
Hi all. Anyone know when the $11,000 limit was set in legislation for renovations in QLD? Ive been renovating for 5 years now and this was the limit back then. As we know,…
5/03/2024
3
We used a smaller qld builder who went bankrupt about 12 months after completion of ours. It was a shame as they were good and relatively cheap and I would have used…