Masterton Homes - The next thread 4.0
Page 704 of 730
I'm not sure who would find them suitable the way they are ... odd that anyone would think to make them that shape without prior consultation. Seriously.
I really hope some adjustments can be made. They make no sense.
Pommie - I know the Savoy range of doors will be in the Mansion package. Not sure about other ranges. We selected a savoy door, but the textured glass panels were additional as was the paint I think. We painted the door rather than stain it. It really pained the painter to paint over such beautiful timber, but I love the end result.
What door are you looking at?
We had wardrobe, pantry and linen cuboard interals installed today.
I drove past again this afternoon and saw flyscreens had also been fitted.
We must be close ...
He mentioned that they don't really make the doors to match up? I thought this was strange, as surely most people would want a grain that flows?? While standing in front of the kitchen, he could see what I was saying, he agreed that the timber grain would marry up by turning the doors ...
Before & After
Pommie - I know the Savoy range of doors will be in the Mansion package. Not sure about other ranges. We selected a savoy door, but the textured glass panels were additional as was the paint I think. We painted the door rather than stain it. It really pained the painter to paint over such beautiful timber, but I love the end result.
What door are you looking at?
What door are you looking at?
Wow they offered a door within a range included in the package then charged for the glass type, that's a bit harsh.
We have always stated we wanted the look of the eclipse display home which is why is disappointing that all these extra costs come out now. The door model there is in the Linear range XLR150
http://www.humedoors.com.au/products/en ... ies/xlr150
Of course I wanted the textured glass. Only. One. Not. Included.
In saying that, it was only $45 for the textured glass.
I also frosted my laundry window, for an additional charge.
The only included frosted windows were ensuite and main bathroom.
That was an additional $23 for 'Spotswood' glass in laundry.
It was all these little changes that added up for us.
I wanted little changes EVERYWHERE.
Can anyone tell me if there is a fixed payment schedule that Masterton will expect us to comply with?
Has anyone managed to negotiate with Mastertons for this schedule?
Thx
Masterton Payment schedule.
Can anyone tell me if there is a fixed payment schedule that Masterton will expect us to comply with?
Has anyone managed to negotiate with Mastertons for this schedule?
Thx
Can anyone tell me if there is a fixed payment schedule that Masterton will expect us to comply with?
Has anyone managed to negotiate with Mastertons for this schedule?
Thx
Hi pommie
Payment schedule is fixed milestone percentages and is pretty even to their costs at each stage, so didn't seek to change anything in this regards
Sevenths
Masterton Payment schedule.
Can anyone tell me if there is a fixed payment schedule that Masterton will expect us to comply with?
Has anyone managed to negotiate with Mastertons for this schedule?
Thx
Can anyone tell me if there is a fixed payment schedule that Masterton will expect us to comply with?
Has anyone managed to negotiate with Mastertons for this schedule?
Thx
we negotiated ours slightly as the bank had certain fixed requirements (fewer number of payments and max % by certain milestones) and M had there own (primarily on no of payments to match their actual expenses). found their accounts people quite reasonable
Sevenths you are deluded if you think that the percentages are their costs at each stage. They are making a 27% builders margin on these builds if they work it correctly and the final payment to them should really be their profit that they deserve at the end.
We negotiated our final payment to be 20%.
Didn't help though really as there as so many things that need attention that were not spotted even at pci. Our 90 day list is building up.
Roc82 those draws are a complete joke. Left doesn't know what the right is doing. If your SS doesn't think it needs fixing show him the photo of how you thought would be as I'm sure we all would expect the same. If not your SS take it up a notch and ask to speak to his supervisor.
Good luck with your builds and get s building inspector before insulation and gyprock goes up and get one for pci. We always said we would do that but didn't and it has bitten us hard I feel.
rox82-- Lovely pictures Rox82! Absolutely love the kitchen benchtop... did you get the benchtop through masterton?
Looks like they've put 3 of those timber doors on upside down though? The grain would normally match up.
Your bathroom is really lovely. Classic and timeless selections. Love the marble penny rounds in the niche.
We've had lots of little bits and pieces completed this week. Data/aerial points and alarm installed, all tiling finished off, garage door installed, and the house has been cleaned. I think the only items left to do are door handles, shower screens, mirrors, AC vents, carpet and some painting to be finished off.
Really hope PCI and keys are not too far away.
Related
28/07/2023
16
i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices
30/10/2023
0
Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section…