Statesman, Greenock MKII
Page 8 of 15
Good luck with those other trade quotes though. Guy in statco told me recently to expect about $50 a meter for the good neigbor fencing for materials alone
If we are getting someone to do the fence fixed to the retaining wall will we need to buy the materials ourself for the fence or will they do that?
One day we will rip our skinny skirting off too. I love that we are building a brand new home but already have a one day list
Thank you! 😊 haha yeh its good to have projects. Definitely getting the yard done will be taking up our free time to start with though
Lol yes yard first with blinds
Thinking roman blinds, or day/night blinds, honeycomb ones looks good too
Also if doing security sliding doors you need to ensure the frames for the doors are flat sometimes they might have a dip near the middle and then the door installers have to lift in the middle which creates a gap. I have been recommended by several installers to get them out to measure the sliding door frames a 4-6 weeks before handover so they can get builder to address any issues with door frame
i will be doing basic vertical, roman or pull down blinds with 4 blockout curtains along rear wall where i have my 2 sliding doors
Probably sourced from bunnings or similar
try and measure a month or so before expected handover during a visit to site
Also if doing security sliding doors you need to ensure the frames for the doors are flat sometimes they might have a dip near the middle and then the door installers have to lift in the middle which creates a gap. I have been recommended by several installers to get them out to measure the sliding door frames a 4-6 weeks before handover so they can get builder to address any issues with door frame
i will be doing basic vertical, roman or pull down blinds with 4 blockout curtains along rear wall where i have my 2 sliding doors
Probably sourced from bunnings or similar
Also if doing security sliding doors you need to ensure the frames for the doors are flat sometimes they might have a dip near the middle and then the door installers have to lift in the middle which creates a gap. I have been recommended by several installers to get them out to measure the sliding door frames a 4-6 weeks before handover so they can get builder to address any issues with door frame
i will be doing basic vertical, roman or pull down blinds with 4 blockout curtains along rear wall where i have my 2 sliding doors
Probably sourced from bunnings or similar
We are doing it theough builder, think x-guard , was an upgrade we decided on
Was looking at blindsonline they send out free samples of the fabrics of the blinds so you can see the actual colour
That website is awesome! Thanks 😊
Yes it is
Related