Individual Design - New Choice Homes
Page 6 of 19
After realising that we had misunderstood sections of the kitchen drawings NCH set up a meeting with their cabinetmaker and our CL to achieve our updated kitchen, I knew there was something that we missed discussing at pre-start..... So glad that we that we decided to build with them as the customer service extended has been prompt, professional and greatly appreciated.
In the end there was a few things. I did not want any end panels on the island bench to go to the floor as I like having a kick panel all the way around, much easier for flooring quad which is the main reason I didn't go with waterfall ends. Then I realised that they were not finishing the fridge recess in the Scullery as envisioned so we ended up moving the fridge to the WIP and putting in more draws which will look a lot better. Then we noticed that the dishwasher recess was not ideal for my built in dishwasher.
I've just realised the same about our built-in dishwasher. We are getting a semi-integrated one and although we'd asked for a panel to go on the front, I've just noticed that the plinth doesn't run across the dishwasher opening. Is there anything else I'm not considering for a built in dishwasher?
In the end there was a few things. I did not want any end panels on the island bench to go to the floor as I like having a kick panel all the way around, much easier for flooring quad which is the main reason I didn't go with waterfall ends. Then I realised that they were not finishing the fridge recess in the Scullery as envisioned so we ended up moving the fridge to the WIP and putting in more draws which will look a lot better. Then we noticed that the dishwasher recess was not ideal for my built in dishwasher.
I've just realised the same about our built-in dishwasher. We are getting a semi-integrated one and although we'd asked for a panel to go on the front, I've just noticed that the plinth doesn't run across the dishwasher opening. Is there anything else I'm not considering for a built in dishwasher?
This is our current Westinghouse in-built dishwasher and the photo that we used during our meeting. We removed the laminated end panels from their design leaving just the white panels and are getting a oversized kick panel supplied by the cabinet maker via NCH which will be installed along with Dishwasher after handover.
In the end there was a few things. I did not want any end panels on the island bench to go to the floor as I like having a kick panel all the way around, much easier for flooring quad which is the main reason I didn't go with waterfall ends. Then I realised that they were not finishing the fridge recess in the Scullery as envisioned so we ended up moving the fridge to the WIP and putting in more draws which will look a lot better. Then we noticed that the dishwasher recess was not ideal for my built in dishwasher.
I've just realised the same about our built-in dishwasher. We are getting a semi-integrated one and although we'd asked for a panel to go on the front, I've just noticed that the plinth doesn't run across the dishwasher opening. Is there anything else I'm not considering for a built in dishwasher?
This is our current Westinghouse in-built dishwasher and the photo that we used during our meeting. We removed the laminated end panels from their design leaving just the white panels and are getting a oversized kick panel supplied by the cabinet maker via NCH which will be installed along with Dishwasher after handover.
Ok thanks for that - so we also don't need the laminated end panels I'm assuming - would that change the dimensions of the other cupboards?
Whilst doing the variation to the Kitchen and Scullery we also added an extra two way switch for the activity room near the bedroom wall, simple as it already had a hallway switch.
Sad news - The ensuite shower outlets and taps are wrong, meant to start 500mm from the corner not 300mm
Hopefully a quick fix? How much were you charged for the variation? We realised that we should have put two light switches in the WIR but only put one on one side. Maybe I should just get a sparky out afterwards.
You have wall cavity on the side of your WIR so not hard to get done after handover, however it could look slightly different.
The 300mm plumbing drafting mistake was spotted by us after the slab went down and the variation was raised and signed in December at no cost as 300mm would put the outlet to close to the wall to use the shower. Unfortunately it appears that the plumber has used the old plans for this. We also asked if the water heater could be moved and they did manage to get the water heater in the new location, so at least the stuff up is on an internal wall. Waiting to hear back from our CL.
I am a light sleeper and require a dark bedroom and the other half does shift type work so no bathroom light shining into the bedroom.
We can close the master bedroom door and visitors/kids have access to a second toilet without having to walk through our bedroom.
Guests using the Study can use our ensuite and toilet if the kids one is occupied and we can still access our bedroom.
Don't have to wait for one of the kids vacate our ensuite toilet to get changed, PIA before work
Doors can be left open or removed, they will only be closed when required and are lot more expensive to add later.
We can put a obscure glazed door on the ensuite after handover for extra light if needed for a fraction of the price.
Looking good! We went out yesterday and still don’t have a roof a week delay against their schedule. Wish they would give us an update as to why without me having to always follow up.
I'm really surprised that your roof hasn't been done this week, the build next to us had their colorbond roof done before the christmas break and their slab went down about a month before us.
Related
10/03/2024
0
Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs…
14/12/2023
14
I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with…
13/02/2024
2
Once you know the basics, the rest is easy. Read my post in the thread linked below. viewtopic.php?p=1919271#p1919271