Yeah I agree Noddy we paid for an upgrade on the Carpet & Tiles. In particular The basic carpet was shocking. Great to see that the trades are back on deck for you. We expected our frames to be delivered on Monday as per SS promise last year, however nothing at this stage, will call tomorrow to see what is happening.
http://harmony-cooranbong.blogspot.com/
Site Costs with Allworth
Page 6 of 7
Yeah I agree Noddy we paid for an upgrade on the Carpet & Tiles. In particular The basic carpet was shocking. Great to see that the trades are back on deck for you. We expected our frames to be delivered on Monday as per SS promise last year, however nothing at this stage, will call tomorrow to see what is happening.Can we clarify flooring. We have Carpet & Tile included. We did ask for a quote for Timber flooring and/or vinyl laminate in one room but no go, they don't do either. I'm guessing they restrict themselves to Carpet & Ceramic Tile flooring does that sound right and/or does that help ? Any other flooring would have to be done post hand over by owner ?
We were told to do flooring after handover, only the wet areas would be tiled. Seems funny they would do carpet with the specials but not the other houses.
Very Basic Carpet was included in our package for the rest of the house ie all 4 Bedrooms, Media & Lounge room.
Our Frames & Trusses were delivered on 12/01.
Wall Frames were erected on 13/01.
Potentially Roof Trusses will go up tomorrow. 7 Months since we paid our deposit and finally some real progress, Yippee !
http://harmony-cooranbong.blogspot.com/
Subsequently a recent update letter from Allworth arrived including a bill of $500 (I don't have the letter handy from memory the charge was slightly higher), which includes the builders margin of 20%. You might want to factor this one in with the pump for piers charge in your budget.
On a good note our external drainage quote of $3550 that was variable/provisional, came back in our favour with a rebate of a few hundred dollars. These plus and minuses will be included in our final progress payment so we didn't need to sort this out now.
Our Completion date according to Allworth is 20/03. Which is virtually 9 months from deposit to key , factoring in our 12 weeks in council, I'll be very happy if they meet this date.
http://harmony-cooranbong.blogspot.com/
FYI. Regards.
Also, someone dumped a bit of soil on our land . See my blog (link in my signature below). I was planning to spread it before construction starts, but does anyone know if I need to remove it instead?
I dont have a blog but here is a link to my photobucket album if anyone is interested: http://s1187.photobucket.com/albums/z400/keelstin/
pman, Allworth started at about 14days into our 20days. They didnt give us an indication, we just drove past one day and we had been scrapped! So keep an eye on the land, I reakon it will hapen soon. Does look like someone has dumped that soil. If you want to keep it maybe move it to the back or something.
Building is certainly a roller coaster of emotions. Since paying our deposit in may we have endured all the ups and downs, my wife's father was killed in a motor accident, 6 weeks later we had our first child, and all the complications of building going on in the background. Plus trying to hold down a job and all the financial pressures that come along with everything in life. It certainly hasn't been easy. It's my wife's Birthday today. The slab was also laid today. Some pictures from this morning and late this afternoon are up:
http://harmony-cooranbong.blogspot.com/
Cheers everybody.
http://harmony-cooranbong.blogspot.com/
Cheers everybody.
Wow I am very sorry to hear all of that. What a terribly stressful time for you and your family. Thank you to everyone for your replies. Noddy09 your place is looking great, it must be very exciting to see it all happen. Pman I really wish we had of gone directly but hindsight is a great thing!
Package Central/White home Group/JBC Apex whatever they call themselves now are blaming the bank...saying that they are holding up the process but this has been since early december. So it has been 6 months now and they have just cut down the trees but can't move any further until the bank gives them finance:( Whenever that is!
On a positive side, we have started and are underway, with our land being scraped yesterday. Our contract is 17 weeks so we should be looking around mid-June or so to move in.
Hi guys just an additional cost worth mentioning. When the plumber was putting our plumbing in before the slab was laid he mentioned a charge for blue metal around the PVC. He said it's different from council to council however our council require it and Allworth don't include it in your costs. I wasn't that surprised of hidden costs early on and thought nothing of it.
Subsequently a recent update letter from Allworth arrived including a bill of $500 (I don't have the letter handy from memory the charge was slightly higher), which includes the builders margin of 20%. You might want to factor this one in with the pump for piers charge in your budget.
.
Subsequently a recent update letter from Allworth arrived including a bill of $500 (I don't have the letter handy from memory the charge was slightly higher), which includes the builders margin of 20%. You might want to factor this one in with the pump for piers charge in your budget.
.
Just got call from the plumbing company and was told he will need blue metal too as the plumber found sill and needs blue metal to connect the stormwater drain. I asked the lady abt the costs but she wasn't aware. But hoping it is less than shadowcollide's $500.
Isn't this included in fixed costs?
Our slab is done and frames are due on Friday.
If the blue metal relates to the external drainage connection maybe it will be covered by your fixed costs ? Our external drainage was variable and we actually got some cash back for this (invoice was less then variable charge).
If the blue metal isn't covered they will hit you with 20 % so hard to guess the cost here. Plumber should invoice Allworth then they will send you a letter outlining the charge.
Cheers.
Thanks for all of your information and tips throughout this thread, it has been mostly useful in my process with Allworth. Our construction has just started. We have had a good pre-building experience with the team at the central coast and head office.
We are building the Grove Majestic at Cooranbong, since it is a large house some upgrades were expensive like the 'H' slab upgrade, more than expected. Also surprised the turn around time is only 15 weeks to build.
Question I have is did you receive many invoices to pay that may of been unexpected ? and did you have to pay within a certain time frame?
shadowscollide your house is looking good, you are just about to finish as we are just about to start.
Thanks,
Bevan.
Houseblog: http://www.bevonet.com/house/index.asp
Soil removal we handled ourselves and got away with it dirt cheap. (we have a neighbour that is constantly trying to build up their block).
The Blue metal charge was $572 and it was added to our final payment invoice. So nothing out of pocket until final invoice.
Our 15 weeks was up on the 27th of March. Technically everything was finished including carpet and tile by this date however the driveway has held us up. It went in today and the turf goes down tomorrow, cleaner Wednesday , Practical Completion Inspection will take place @ 2pm on Wednesday 6/4. Not too bad in considering the two week Christmas close down. We are taking a bank cheque to the PCI and if we make the final payment on the spot the Supervisor will issue us with the keys. Obviously we will complete a defects list first and only part with the cheque when we are sure everything has been identified.
Your home is a big build but I'm sure Allworth will finish it within the 15 weeks. They are very organised on the Central Coast and all the trades work as a team. Fingers crossed for the weather though as this time of year can prove difficult (hence our delay with the driveway). But once your roof goes on the pressure is off a bit in terms of rain.
Goodluck and I'll keep my eye on your post.
I'll post some photo's up after the inspection on Wednesday (minus kitchen appliances obviously which should arrive within a week).
http://harmony-cooranbong.blogspot.com/
Related
17/04/2024
1
Henley should give you some indication of site costs. Too many variable to give you any reasonable accuracy
18/06/2023
0
Looking to tile the facade pillars rather than rendering. Builder is quoting 2500$ laying cost for upto 10msq. The 2 pillars come to be 16msq. So laying costs are 5000$…