Our Slab due to be poured Monday.
Page 1 of 1
Our slab is high due to ahd flood levels 100yr something. It feels so exciting now we are on our way. Cant wait to see it done.
Now Im pretty shocking at posting pics, but see how we go.
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain3001.jpg
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain3003.jpg
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain3002.jpg
The garage will be lower.
Is this a multi level build?
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain4001.jpg
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain4003.jpg
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain4002.jpg
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain4004.jpg
http://i627.photobucket.com/albums/tt356/XindiBirmans/iphonepicsagain4005.jpg
Our builder rang today to let us know there will be more costs due to the extra concrete used for the footings, any idea how much? He will let us know tomorrow.
Also we should be in by mid to late September so 18-20 weeks he said. They give longer around November but he doubts it will be that long.
Our builder rang today to let us know there will be more costs due to the extra concrete used for the footings, any idea how much?
When our builder rang he said it could cost up to $15k more.
It certainly looks like there was a lot of concrete (as onc said)
Maybe $3-4k more? (really rough guess)
They should have been able to work out a lot of this by looking at the plans.
Ok if it in only a couple K variation far enough. However if they are asking 10's of thousand then I dont think that would be far.
Meanwhile today they have started on the frames already. Is this ok for the slab? Guessing so or they wouldn't do it. I'm happy to see things rapidly progressing.
Plenty of meat in that slab.
I will also be interested in the 'extras'.
The builders get paid for each stage... looks like they are going for a record 2 stages in a week.
I just hope they don't Dyna bolt and use chemset instead.
Im just glad its being fixed and hopefully it will work.
They look to have chemset the frames and there are some nails as well in the frames on the slab where its overhanging.
Wow it really feels like a house now the frames are distinguishing the rooms and you get some idea how big the rooms are. Just love the house. The garage is massive. It wont be used to house a garage though as we have the garage shed next to the house as you can see in the pics. It will be an office and gym.
My apologies for removing my photos but I felt uncomfortable that when I googled images my pictures come up for ellington, so I removed them as it feels too personal to have them out there for all sorts of people to see. iykwim. Trust issues, lol.
Related
28/02/2024
0
Hello needing some advice. I was about to build my Alfresco and needed a new slab and remove exisiting slab as its not standard. So they start to excavate and jackhammer…
12/06/2023
1
The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists.