Small slab for chicken run
Page 1 of 1
Thinking about laying a slab for a chicken run, approximately 2m by 5m. I've read that the working time for concrete is roughly 2 hours depending on conditions. Assuming that all the prep work is already done, and taking into consideration the working time, is it feasible to pour a slab of this size by myself using a rented concrete mixer?
Do a lot of DIY around the house, but never worked with concrete before.
Thanks,
N
Completely forgot about my post here, thanks very much for the reply!