Two forensic Engineers and Bluescope steel (Fence Manufacturer ) have stated colorbond fences are not engineered or designed
to retain soils .
Engineer (Neighbour appointed) photos 1-8 states in his reports "There are no soils bearing against Fence "
photo 8 shows some of the workmanship that Engineer states "That works are done in accordance with documentation "
Photo 6 The Engineer above Avoided to report and failed to do a site inspection and only relied on discussions and a drawing
from neighbour that provided a false house footprint that the rectification works were to be done on entire house,
drainage points that don't exist ?
Photo 4 Does anyone see a drainage point on pavement ? It's missing and this Engineer has reported that water would flow there ?
Joint Engineer photo 6 had also failed to report on Concrete pavement ? (Weep holes and the NCC)
photo 4 Also in his report " Flood test all water are flowing to floor wastes ?
I believe these Engineers should be reported to the VBA
Thanks
Uncle Bob