Concrete slab formwork - what happens after?

Page 1 of 1
Can someone with experience tell me what is usually happening with the formwork timber, which is used for waffle pod slabs construction?

Is it getting recycled and re-used or simply dumped?
The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists.
Related
9/01/2024
3
Leak through concrete after putting frames up

DIY, Home Maintenance & Repair

Are you doing this with a building permit? Conversion of a non habitable room into a habitable room requires building permit.

28/02/2024
0
Leak after Concreter poured concrete

Owner Builder Forum

Hello needing some advice. I was about to build my Alfresco and needed a new slab and remove exisiting slab as its not standard. So they start to excavate and jackhammer…

15/12/2023
1
New Concrete Slab extended exposure duration

Building A New House

yep, clearly mark where the infloor heating pipes are before drilling or nailing

You are here
Building ForumGeneral Discussion
Home
Pros
Forum