AU
PistiMay 06, 2011 8:46 am Any Good Drafting Services in Melb?Give Omer of OK Designs a call on 0403 108 520.
He is in Roxburgh Park. He charges depending on the size of the house and he can also assist with organising soil test,… rlay1 replied 6 May 2011 ago rlay1May 06, 2011 9:36 am Lock up stage?Mine does not have that clause, just plain lock up stage. I guess there has been some delay due toweather, hopefully they are doing some work inside of the house. rupzMay 06, 2011 10:18 am Building with M3tric0nWe ended up only having to pay 3,000 an it was delayed by 5 months, our house is on it ways now about the bricked Natti replied 6 May 2011 ago NattiMay 06, 2011 3:49 pm Possibly delayed?It depends on the builder.
I had one house completly built in three months (and great quality)
Another took six months with (OK quality) Anyone has 9 feet ceiling for 2nd floor?Thank you everyone who have answered it, great to know that most people opted for higher ceiling too for 2nd floor.
I'm still considering it, but thanks for all the comments!! Location of water meter tapHi,
Quite a few people have had this issue on the forums (including me!).
I was informed by City West Water that a plumber could move the tap by 60cm.
Anymore than this… creamMay 07, 2011 10:51 am Builders pros & consYeah that means north is in the bottom left of the picture
LOL @ buying them presents. They would love that. We currently own our house we are in now but we would have… carpet / flooring questionsTracey - we did it ourselves, builder went @rse up before the house was finished LOL. Whatever the best underlay was that was what we got - one request from DH was to… kyton replied 7 May 2011 ago kytonMay 07, 2011 11:37 am Boral Blue Rio BrickSorry to bump an old thread, I just wanted to ask, are the blue rio bricks painted?
If they get chipped are they a different colour underneath? I have a view!! What to build?!I love the metricon denver, I had planned on having that for the past 2 years until now, when we finally found a block that I love and I realised that it totally didn't… mike-May 08, 2011 2:02 pm New Sewerage ConnectionMy figure assumes that they will dig up the road. They should provide you with a connection point inside the boundary. The connection between the house and the connection… Bathroom: Tile questionI seen it done all ways from real rough with paint slapped on to neat and flat or neat and sloped. I think with the big thicker tiles they try harder to make a nice… Hi all,
Help us in choosing bricks. We need to choose 2 colour bricks. One colour for facade and one colour for rest of the house.
Our standard bricks are
paddock next to cascades on clydeCan't build near power lines. Don't think there's plan for new estate. On cascades, selandra and more estates on berwick cranbourne rd near Pasadena. This area near… Gio replied 10 May 2011 ago Damp Proof CourseIt should be the full width of the bricks.
Any less and it creates a moisture bridge which defeats the… New home builder - questions!if you are talking about building over a sewer in Frankston,Vic you apply to South East Water.
Just go on their website and do a search for "Build over" Solar Powered ElectricityHi Guys
Thanks a lot for all replies and above calculation part which is very helpful. I already got few companies arranged for quotes. Will keep in touch. NiMa replied 11 May 2011 ago kytonMay 11, 2011 10:01 am Double-Dipping for Christmas?Well....
it pays to have an intelligent, non-emotional discussion with your CSC stating your displeasure and the pressures/timelines you have to contend with!
Our… 16K difference between EB and Wisdom HomesAnd since that post.. the saga grows... now I find out they tried to go out to our site unauthorised by stockland, when 4 weeks ago I gave them all the contact details… Lot927 replied 11 May 2011 ago Traditional FacadesHi
there are some wonderful looking facades out and about these days that come with a hefty price tag.
Had anyone started with a traditional/basic facade and done your… Lot927 started a topic 11 May 2011 ago P/D's - Double Stoery HomesHi Ilias,
My other half and i did a knockdown and are building the Waldorf by PD. Our block was virtually flat but had… neweyMay 12, 2011 2:41 pm Travel costs quoted by builderI understand its a standard type of charge, and didn't even think much of it until a couple of our friends who had built in the area recently pointed out the cost and said… $50,000 for site costs?? Are they kidding?Hi,
We are building with them as well, in NSW. I just want to say your site cost is not high compare to ours. Ours is 45K for site costs (1 meter fall for the building… Soapy waterwhen you say the tiles have silicon, what do you mean? is it extra silicon spilled on the tiles that looks messy? if so then the builder sounds like they are being lazy!… donuts replied 13 May 2011 ago slab being poured in winter.....Just to get technical the worst weather for concreting is either below freezing or hot dry days.
The chemical reaction of concrete actually generates quire a bit of heat.…
|