AU 
moxieNov 13, 2012 9:39 am Please help me understand!
Glad to see you sorted it out! Looks like you will start your build the same time as us! Looking forward to following it! flooring tiles with builderfor glossy look go with porcelain tiles but the cost of tiles and installer will be much higher than your current quotes. Henley Monaco Q1 at Williams LandingHi FND!
I encounter a similar situation as yours.
I have a block of land in Allura estate - so we are closeby!
The sales lady said that Henley cannot give a fixed… mtz08 replied 13 November 2012 ago mtz08Nov 13, 2012 11:08 am Adz10Nov 13, 2012 2:51 pm Estimated move in dateHeard from our builder today - estimated completion date is end of January!
Would have been nice to at least do PCI before Christmas, with handover beginning of the new year  ducted aircon costsSorry, my bad
You are right, both are in KW's, however upon checking it is 9kw and 19kw
Dan xxennon replied 14 November 2012 ago Looking at Building.Metr!c0n have a few ranch homes I think.One is the Denver, which I happen to love. It comes in 36, 27, and 24 squares so pretty much whatever you need. They have floor… MrsT12 replied 14 November 2012 ago Building Inspector PerthNo worries. I'm sure if you pmed any of the people who mentioned a building inspector they used they'd be happy enough to recommend or not recommend. kexkez replied 14 November 2012 ago Land north or South facing?Assuming they are both flat.......South facing with living rooms on the back.
Better than North facing but not as good as east or west facing (see BUILDING WITH HENLEYThanks for all that. I'f henley estimate huge site costs we will def go with Bentley homes. They have some nice designs but are also quoting us about 50k for 2.5 mt slope.… Initial Deposit of $500-$1000 with BuilderWe're at tender stage with a few builders and two of them have offered us a $1000 rebate if we go with them over the other builder, so effectively we are getting our 1K… zozo replied 15 November 2012 ago paintThey won't sand the walls back. Painter should have at least brushed off the walls before starting.
2 bkm2009 replied 15 November 2012 ago Sloping block builder in Sydney .... helpTake2 offers some good advice. It is about design. Take2 describes what we call Good Hillside Building Practice. A lightweight, flexible structure that almost floats on… Building With Mirvac @ Middleton Grange?
Hi,
Can anyone please tell me that after I pay the minimum 5% deposit down for the land, is it a requirement to then put in a tender in for the construction of the… building to lockupHi How are you going? We often build to lockup and we actually have a house that size starting soon. It is just over $500,000 with the owner providing own windows. Tell us… CBD Developments or New Home NetworkHi All,
Just wondering if anyone has had their house built by any of the above? Looking for some feed back as we have been referred to by a friend, however unable to find… gp23 started a topic 16 November 2012 ago MrsTYNov 16, 2012 3:10 pm how long til handover are we on track?Cupboards have arrived at our house now, giprock, skirtings etc all done and locked up.
Our approx date of handover is Feb 18th are we on schedule for that?
We are doing… babysaurs started a topic 16 November 2012 ago Survey/EngineeringGreetings
I am doing the pre-lim before I confirm I want to buy a block in the kelmscott hills - just want to make sure I am doing things in the right order - it will have… jamt007 started a topic 17 November 2012 ago Certificate of OccupancyHi Boosho, I just pulled out the building permit and no mention of a retaining wall, nor is there any mention of a retaining wall on any of my plans.
Thanks for the info Caz76 replied 17 November 2012 ago Caz76Nov 17, 2012 8:48 pm My Q2 Retreat.Hi (again!) hehe
Yep we are also going with fans as well as the Actron - the fans we are going with are called Hunter Pacific Concept 2. The bedroom fans will be a… Anyone building the Ivory with Mainvue?Hi Ivory,
We are thinking of builing this home aswell.. how is the process going??.... We were going for the Emporio but now thinking of going for something smaller...… Rangi83 replied 18 November 2012 ago A favour to ask - HIA NSW Building ContractThanks boson! That's interesting, sounds very similar to the ACT contract but with some differences to the time frames. Interesting that this "preliminary requirements… Ribbon replied 18 November 2012 ago Terms in building contractLiquidated damages are meant to be a genuine pre-estimate of your loss if the builder goes over that timeframe and damages that amount to a "penalty" are unenforceable. … Ribbon replied 18 November 2012 ago Soil testing/reportsHi all
We are building in SA, can anyone recommend a good company/person who can do an independent soil testing/report (to see soil type etc) on our block of land and… LynneY started a topic 18 November 2012 ago Silt pit connection - Waterhall EstateCool - and did u do the downpipes yourself? Im looking to build to lock up in the kelmscott hills; basic design, sloped roof from front to back - gutter at back; two down… jamt007 replied 19 November 2012 ago
|