AU
[MrsCrawz] Building our dream homeThanks heaps guys! We love it too.
I just got a call from our builder saying the they have started cutting our block this morning Eeeek! I can't wait to go out there… Timber look/coat garage doorsB&D have a function on their website that will allow you to search for a retailler/dealer of their product. Call a few and see if they have any in the shop or on display… kid81 replied 13 March 2013 ago kid81Mar 13, 2013 10:15 am StormwaterI have done drainage in the past here in melbourne, sometimes stormwater gets done before handover... but sometimes we did sewer drains and stormwater at the same time and… Big Builder promotions.Xmas seems to be a quiet time from what I've seen- with everyone saving their money.. And sometimes around July - financial year. tim_k replied 13 March 2013 ago tim_kMar 13, 2013 7:56 pm benchtops???I don't think it matters if the kitchen has a different bench finish than the bathrooms. Maybe that's because I will have different vanities in each of my bathrooms -… Wall panelling supplier and installerHi all,
Would anyone know a company that can supply and/or install wall panelling in Perth?
I'm trying to achieve the look shown below. It's called wainscoting in… dakr started a topic 13 March 2013 ago Jm14Mar 14, 2013 12:38 pm External louvres/shuttersOh ok, fair enough. Unfortunately I don't know of anything but I hope you find something. Otherwise perhaps deciduous vine or a solar pergola for some of the windows? I'm… How big is your backyard
Mine is 14m deep x 12m wide. Enuff for me and the dogs[/quote
I think you told me that you built with Trubuilt homes? Is that in Arnold Creek? Have… Wanneroo CouncilHi guys I'm building in Catalina On a small block so it has to have planning approval, there telling me 6 weeks worst case has any one gone through the planning approval… Olly12 replied 15 March 2013 ago Building the Monaco by Dechellis
Hi Monaco - you will need your magnifying glass ... we just discovered (after living here for almost 18 months) that the downlights in the two hall niches are not centred… Good and Bad - I got Occupancy Certificate issued however with Building Order to 1.Fix AJ's, 2.Weep Holes and 3. To get Engineer report that… The latter ... existing pole but they have dug underground and put a temporary 'thingy' up for the build. As shown in this photo here on the… Building with Dale Alcock in Wattle Grove
Hi Angelag.
Sorry to hear about the colour issue you're faced with - could you please send me a private message with your details and job number so I can look into this… Slab issueswill be patched with concrete, i am assuming it will be tiled? Site supervisorsAnd when you do contact them, the construction manager calls you a pain in the arse!!! In all fairness our SS never rang however if we text him a question he would always… DeeMMMar 17, 2013 9:10 am LetheMar 18, 2013 1:03 am Any build on a block 10.5M WIDTHOur block is 312m2. We ended up going with a custom build, because we couldn't find anything we really liked. There is info in my signature Agape replied 18 March 2013 ago AgapeMar 18, 2013 12:00 pm Contract Negotiation - Liquidation DamagesThank you so much for your responses, it has given me something to think about ... the build time is something that definitely impacted on the choice of this builder -… Agape replied 18 March 2013 ago AgapeMar 18, 2013 8:44 pm Solar Hot Water - Electric BoostLike all storage systems it is thermostat controlled. Unless controlled by a timer the electric boost will only come on when the water temp drops below the required… Has anyone built with Kurmond Homes ?Thanks Doohan - I do love my bath!
We ended up spending more. Kurmond gave us a hefty allowance out of our build (internal/external) but it's a big home. We have spent… Lilac replied 20 March 2013 ago LilacMar 19, 2013 11:38 pm Really stupid questions......There are also sometimes rules around front door placement that would stop you from moving the door like that. We were looking at side-entrance houses so as not to have a… Forg replied 20 March 2013 ago Henley Monaco options
Hello... we just received our contract from Henley it states 260 days extimated for build including delays.... is that right for everyone else? sunct replied 20 March 2013 ago sunctMar 20, 2013 7:57 am Cascades on Clyde
What part of Cascades are you looking at. We are in stage 24 and nearly at key handover. Energy ratingGive yourself a point for:
Aspect;
Roof Insulation;
Window coverings;
Wall insulation;
LED Lighting;
Solar power - Electric and/or… Can I do the timber floors myself?Only issue you might encounter is with the skirting boards. Just ask your builder to cut paint, but not install. That way you'll get a nice clean look around the… Builder still hasn't started.
Hi there, our builder has 310 days to build and after that time they pay $250 p/w they go over. We are building a 2 story house as… First Home Builder - Looking for infoHi Guys,
Newbie here and I am interested in building our first home and was going through this site last few days to get some info. Site is quite informative and gained a… rawg started a topic 21 March 2013 ago rawgMar 21, 2013 10:22 am
|