AU
ZIP Tap DelimaDecided to sell it, and then upgarde to cold water. Going cheap in the classified section. If it doesnt sell this week you will find it on ebay next week.
Martin replied 27 May 2009 ago Conveyancer or Solicitor?
Hey Focus06
Can you please PM me the details for both?
$165?
We used a Conveyencor for all our legal and transfer on the land which costs us… Should I get a site survey? Help.Yes I think it is a good idea getting your own completed. But be careful.
The first builder we were looking at went out and did their soil test and the result came back… JJ305 replied 28 May 2009 ago JJ305May 28, 2009 11:05 am TILES AND PAINT before Vanities???My vanities were installed prior to the paint and tiling. I would imagine they would have to do some patching if they are going to do it around the other way. When your… gkx64May 28, 2009 10:16 pm
I'm sorry but what do you mean by considering a "step back" floorplan, rather than an "L" shape? Would def be willing to consider options to… Electrical PlanWe did it all by hand on a print of the floor plans. That was fine for the builder.
The following are very useful:
Insurance after /at handoverDH pointed out I forgot to get the persons name. duh but it's all done and paid for. and the 60 days sounds pretty much like what we had when we took a trip overseas… kexkez replied 29 May 2009 ago conveyancer- what should we use them for?we got the standard hia one sent to us - so once it comes to progress payments they will verify that it is time to pay, is that right?
Thanks- they have seen the land… Evergreen Roof TilesTiles are a poor choice for roof as regards future energy costs for aircon because they are heavy (have a high thermal mass).
That means that in summer, the sun heats… 31231 replied 30 May 2009 ago 31231May 30, 2009 7:30 am Should we build with metr!c0n or s!m0ndsBefore I begin, let me say, I almost built with M3tricon. We had a nightmare run with them admin wise and pulled out. But I believed then and I believe now, we were just… joles replied 30 May 2009 ago jolesMay 30, 2009 9:26 am maintenance of P-Class soilHi all,
Although developer claiming that block has been comapcted upto 95% of M class soil and block should be treated as M-Class or H-Class. but… kek replied 30 May 2009 ago Colorbond cost vs Roof Tiles?Tiles are a poor choice for roof as regards cooling properties because they are heavy (have a high thermal mass).
In winter timee there is a lot… sorry for delay, here is better pic taken with proper camera, you can see how the door strip or the tiles appear to be crooked but in fact the wall is out of alignment by… HelynMay 30, 2009 11:40 am When to apply for new crossover?In northern Victoria we went to our council and they said that the concreter applies for the permit. The permit is only required to allow… COLOUR or TILES appointment first?We had our colour appointment first, but I had already picked the tiles and had samples with me. That way I could tie everything together. The tile… Hels replied 31 May 2009 ago HelsMay 31, 2009 10:06 pm Thanks for the help! I am attaching our building envelope. Just wondering if anyone here likes playing around with floorplans and has some suggestions of how we could… Building permit???yep he got back to me, its not actually ready, but he said plumbing is the big one and the other approvals are usually done at the same time, so he's checking where… D&SG Custom House Plansounds like you can do as you like, change what you want and still get a good price! good deal there! have you heard from Council yet? I hope… D&SG replied 1 June 2009 ago Front Elevation and Plans - Take a lookHad to make a changes to the plan.
The engineers plan was to cut the entire block and we'd end up with a 2.6m high retaining wall along the back. This meant 1000 tonne… the cost for screw pilingYes they are expensive. Also it depends on how many you need. Who are you building through? Can they build on stumps? Maybe cheaper... JJ305 replied 1 June 2009 ago JJ305Jun 01, 2009 7:59 pm jolieJun 01, 2009 8:30 pm Studio M - Energy Saving OptionsI got my sales guy to email me a pdf'd copy so I could read it and check it well in advance of the meeting. This gave me time to mull over it and spot any errors, scribble… Help please!Facebrick just means that they will lay the bricks nicely and no render will be on them While ive been waiting for my land or house to progress my parents block seems to be moving full steam ahead, we're happy that at least someone house is under way finally.… Bricks - mortar jointsraked and rollled are the strongest mortar joints. Flush isnt that good sometimes as the morter is not push in and compressed like the other two methods. Martin replied 2 June 2009 ago I have handover.....I just had a quick look at your blog too, it looks like a great house. Congrats on handover, good to hear it was a nice quick and smooth build for you Hels replied 2 June 2009 ago HelsJun 02, 2009 10:05 pm Wall insulation for new buildWhat size batts did you use internally? 430mm or 580m? Just check the stud spacing. For internal walls it's usually 600mm between studs'… Building an AlfrescoSorry, it's just an old joke from an old thread that kept making the rounds.. was just in a silly mood.
You are right, an alfresco is an under roof structure and a… jolie replied 2 June 2009 ago jolieJun 02, 2009 10:48 pm Price for non standard floor plan changesPorter Davis also told us that we would get charged $1,000 for re-design fees + the cost of the modifications.
We weren't 100% happy with the plans and didn't want to… GSK replied 2 June 2009 ago
|