AU
Building delays and claimsIt did pour like crazy at our site too. But that was the day they put the roof trusses over the garage, completed framing and invoiced me the very next day for framing… Ours were installed with sleepers underneath.
Found this image from… Pre-lim ContractHi Srichz,
I guess the answer to your question varies from builder to builder
We made several variations after signing the contract, for example, upgrade our toilets,… help!! I need feedback on my house planCould you swap the laundry and bedroom around so both have doors into the hallway? If you switch it like the poster above me then you are bringing the family room closer… Mrs P replied 17 April 2011 ago Mrs PApr 17, 2011 6:22 pm Land Release to Build TimeframeOur builder had all the paperwork lined up and moved very quickly once the land titled (which had been delayed by the developers about 6 months). They began the lead in… DrMatt replied 18 April 2011 ago How thick to pour air con unit slab?Ours is on 2 x concrete pavers and not connected to the house at all to prevent the vibration noise going through in to that room.
DH wasn't real… hparis replied 18 April 2011 ago Walk in robesHi, you could check out the Met'con site. They have heaps of homes with that layout and they have lots of pics on their site.
(Fill in the blanks on Met'con.... the… joles replied 18 April 2011 ago jolesApr 18, 2011 9:58 pm What project builder would you recommend?Not sure where you are building, but have you tried Coral Homes (they build on the East Coast, from around Sydney up to around Toowoomba)? We built with them last year -… ~Nic~ replied 18 April 2011 ago ~Nic~Apr 18, 2011 11:20 pm Knowledge or advise....please?He met with the Earthworker today at our block. I don't know the details of the discussion, all I know is that there was some negotiating and the earthworks company and… Dennis Family Home TorquayHi all. I was wondering if anyone has built with DFH recently in the Torquay/Geelong area. We are having discussions with them at the moment but was just wanting a bit of… pish started a topic 19 April 2011 ago pishApr 19, 2011 10:46 am Floorplan HelpExactly what I was thinking Bel, I am not as clever as you though
Where the old ensuite is could be a WIR. gogo65 replied 19 April 2011 ago carpentersHow much do you charge per square metre to do a frame , lockup, and fix
What don't u understand What to look for at PCI ?Hi there,
This is great, it certainly does help when you have an idea of what to look for.
Regards
Logan Logan replied 20 April 2011 ago LoganApr 20, 2011 7:16 pm JORDAN SPRINGS AND FIBRE OPTICSFor those of you who have purchased land at Jordan Springs, has anyone's builder made provisions for connection to the fibre optics network (FTTH via Openetworks)? And if… normette started a topic 21 April 2011 ago ILove_SandhurstThanks, Paul. I shall definitely have a read through of the Sandhurst rules and regulations before commencing my build. I would probably supply H with a copy as well so… Masterton SymphonyHi all the Symphony is a lovely home, they all are though its hard to decide! was originally going to go with a double storey however due to getting overall pricing looks… ann81 replied 21 April 2011 ago ann81Apr 21, 2011 5:17 pm BUILDER TO DO SEPTICS ???CHEERS SEDGIE. THATS A GREAT HELP. OUR SHIRE ALSO REQUIRE AN ECOMAX SYSTEM. PHONED AROUND A FEW SEPTIC PLACES, BUT THEY DIDN'T SEEM TOO INTERESTED? MIGHT HAVE TO LET THE… JACEM replied 21 April 2011 ago JACEMApr 21, 2011 11:06 pm storm water connecting problemThanks for your tips Bash,using a 9inch grinder diamond blade with several cuts, ozito demolishion hammer to chizel out and Bobs ya uncle all sorted cheers. What Handover Prezzie did you get?
Snoofie, you'll be pleased to know we did get something. Not too fancy - just a BBQ set, tongs and a cook book. I guess you are building prestige,… Life's been busy and it's been a while since my last post!
In the meantime, we've had the frame complete and the brickies going at it. 2 weeks in.. I'll let the pictures… Things that could be left until afterwardsMake sure that you put powerpoints in positions where another double can be piggybacked off the wall behind by your own electrician. This may save money.
Also consider… Camrw replied 23 April 2011 ago CamrwApr 23, 2011 8:34 pm New electricity regulations?Had a look at the page, thanks Trinity.
Hopefully the electrics people will know all about this when we go for our selections. Camrw replied 23 April 2011 ago CamrwApr 23, 2011 10:02 pm PitekApr 24, 2011 12:50 am Here we go ! Eden 31 with RawsonsSelina,
With the recessed stacker track, are you having the alfresco floor height the same as inside, so it flows from outside to in?
That is what I planned for, but looks… Thank you for the quick replies!
What type of doors are you putting in Starz? I'm still deciding (between two from Wrussel Williams) - these are… StarzApr 25, 2011 6:36 pm
|