AU
Building On PolesI live in a house built on steel poles. My block is very steep with 10m fall front to rear.
The house was a standard timber framed brick… Paint opinion neededYour selections are pretty almost anything would go but I would suggest a white with a bit of black and a tiny bit of ochre so it doesn't look too dead/flat. Eg dulux… In-wall cistern toilet suitesWhat would you say if your builder wouldn't install toilets with an in-wall cistern, purely because they don't like the idea of them re… bpratt replied 19 August 2015 ago Electrical Spend on a New BuildMy electrical spend at pre-start was $2400. This included 2 double GPOs to kitchen island, 12 other double GPOs, 1 waterproof double GPO, 1 upgrade from a double to a quad… oduen replied 18 August 2015 ago oduenAug 18, 2015 11:32 pm Building Delays with MJHJust reading through everyone's post asking how long between contracts etc. We signed our contract (3k deposit) back in June 2014. Land was registered in Oct 2014. Council… SebringHi all so I am only new to this so hope it works, we are doing a knockdown rebuild and are building the Sebring with Allworth in Seven Hills. We were mucked around by the… Awning window in shower... a highlight window and fan will be sufficient ventilation? As a side note: our highlight awning window is (574 mm x 1530… Manic replied 18 August 2015 ago ManicAug 18, 2015 2:47 pm Help with floor planI'd try to get hanging down both sides of that WIR. If you pull back some of the cutout out of the front corner, you could shorten up the bedroom a bit to get the shower,… What was your electrical spend?I spent $4400 on light fitting. 41 down lights, feather lights, oyster light, sensor spot lights and wall lights. The most expensive is the 36 brightgreen d900s for $2100.… Volume builders price negotiationsWe were offered an initial discount of $1200 on almost a 300K house. We have not paid the initial deposit as yet but the builder was adamant that she can go any further… 1HB replied 17 August 2015 ago Home Group WA Reviews....
Hi All,
A few months back we received an advise from HGWA and Ford & Doonan regarding an upgrade to the ducted reverse cycle aircon that is included in our package. It… dy1jaw replied 17 August 2015 ago Construction certThat does not sound correct. I think in NSW the construction certificate is valid for as long as the development consent lasts. I recall a duration of 2 years at one… Has anyone built a Kingscliff 16?hi we are building the Kingscliff 16 as well and if there is anyone who has finished building i would appreciate photos to get an idea of what it will look like as eager… Made a few changes. Hopefully for the… Opinions on Roof ColourI never thought of that oneJohn. We had originally told our builder that we were going with option 2 but we have option 1 & 2 on our front porch and look at them every… LouR replied 16 August 2015 ago Gemmill Build - SORWent around yesterday and the soak wells have been installed.
While I was there I noticed that the edges of the pad had been painted… Ben Trager Sunshine Burns Beach Build
We have a window splashback too and they are doing our laundry one so I'm not going to install our glass one then until handover as I don't want to risk it and sounds like… New Home - choosing an elevation
If you have eaves on the portico, I'd go with B over A, because it's simpler and cleaner, but there isn't a lot of difference in it. If you go without eaves though, I can… Building with Wisdom Homes - DaVinci19Temporary Fench is on now on my land. Admin officer of Wisdom Homes was confused regarding compliance of a clause related to the fund, the confusion was arisen as I have… Rough estimate of site costsHi all, I just got my survey done and the ground is 1 metre below where the habitable area level would need to be. Is trying to raise it that… SuezpAug 14, 2015 9:34 pm Builder Background Check - How to do???Hi,
In Victoria, the specialist homeowner Builder search agency is Builder Background Checks Victoria:
"What We Do. We empower consumers by providing covering the key… PonzuAug 14, 2015 3:10 pm Henley and building in GeelongThat is what I was told, as they use specific builders over and over again if they are not local to Geelong or have sub tradies in the area they would be required to travel what do you think about the House PlanWhy is the garage at the opposite end of the house entry? I would reverse the door into the garage rather than into the hallway. Hallway area into study looks like wasted space. d@n replied 14 August 2015 ago Oaklands SchofieldsHi there, I am new here and close to buy a lot in Oaklands Schofields project, has not seen/signed contract yet. Is this area flood prone, when the schofields road… JSK started a topic 13 August 2015 ago weskyAug 13, 2015 12:32 pm
|