Is this house expensive to build?Thanks for the explaination. We're at Fixed price contract stage so hopefully a lot of these items will be spelt out. But I'll ask the question about site specific costs. su ann replied 21 September 2009 ago 2paisSep 21, 2009 11:38 am angelSep 21, 2009 12:57 pm DQH vs Burns vs build to lockupI have nothing but praise for DQH. My parents built with them back in 1991 and there is absolutely nothing wrong with the house today. I've been in rentals between 1 - 3… alk replied 21 September 2009 ago How long did you slab take?Our Site scrape was on the 4th of Sept, we still do not have trenches for the footings yet. We were sent a letter today requesting an extension in time (per clause what… TamDaz replied 21 September 2009 ago Outdoor woodfire pizza oven
Instead of self building you should buy portable . As they are easy to move from one place to other. I recommend you to buy portable WFPO from ilFornino. They have large… Mel&Em replied 21 September 2009 ago Building Talbot 28 in CraigieburnMy cousin who built with M* had the same issue regarding the invoice being sent before completion of lock up stage. She rang head office complained and refused to make pmt… Shelz replied 22 September 2009 ago ShelzSep 22, 2009 2:09 pm Help with fencing disputeWorth a thought. Thanks Lou. We already have quotes and can easily show them what we were prepared to pay. When they see the price difference it might make them change… juljas replied 22 September 2009 ago Chalk line between tiles and bricksHi
My builder has used chalk to fill gap between tile floor and brick wall as he has cut tiles into different sizes and the gap between tiles and brick is very large. I… NcgQ started a topic 23 September 2009 ago PugsSep 23, 2009 10:00 am Tilinghow do you actually know they are from two batches.
To me it sounds like a cut and past answer. it sounds to well written to be custimised to your issue. borg replied 23 September 2009 ago Pre handover meeting- HELP!I had my PCI yesterday and I didn't feel the need for an inspector as I think I have the worlds best SS!
I've not had any real issues with anything through my build and… lisanne replied 23 September 2009 ago Landscape Plan, did you have to get one?We need a landscaping plan, it was part of the land contract and I always thought it was more developer requirements than council. I will have to check it out. I know… Sierra replied 23 September 2009 ago Question about upgradesBy upgrade package do you mean the promotion where you pay $1000 and get $30k worth of extras of something similar?
Its a nice thought, but I dont by removing part of… Sierra replied 23 September 2009 ago Brickwork - can you see the issue?Thanks guys - i spoke to SS and got the same answer.
They have installed the lintel and brickwork above garage door. Most of the right hand side is also bricked - exciting! dvs_dk replied 23 September 2009 ago Building processwent to the First Home Buyer seminar/presentation from Porter Davis today.. learned a few things.. and their house and land packages are not bad... draco76 replied 23 September 2009 ago Any more Seville Grove-ians out there?well i hope things get sorted and settled for you soon.
It should be exciting choosing the flooring !! keep us posted with some pics!
ya lot of changes happen very… tinfish replied 23 September 2009 ago DriveawayOur exposed agg driveway was $93 p/m which included site costs.
Coloured is costing $53 p/m.
If you are in S.E Melb I can give you the details of my concreter as he's very good. Hels replied 24 September 2009 ago Burbank???Thanks guys..
I found the other thread..
Will moev any further questions I have regarding Burbank there.
Cheers. yaslin replied 24 September 2009 ago Builder stuffed up..If it's a case of your word against theirs you do have rights. I suggest contacting your state consumer affairs (Consumer Affairs Victoria here) for advice.
You are… mudmap replied 24 September 2009 ago Fencing and building delays!fencing is always 4-8 wait minimum. Ironically the better are probably the ones you have to wait longer for. Expect to pay atleast $45 per meter for a basic pailing fence. borg replied 24 September 2009 ago Signing contract with H3nley
Mmmm. That is a bit different. But don't worry... If you suspect you're getting overcharged for any of these options/upgrades, ask us on here and I'm sure someone will… When you move inWe received a phone call from gas/electricity provider (they got our details from our builder) and got it changed over to our name.
For the bins, we went on our… helen9 replied 24 September 2009 ago Have these bricks been cleaned??No rendering to be done - this is meant to be the completed product. I had another look at the house today at other areas of the brickwork and it's almost as if someone… C&C replied 24 September 2009 ago Rainwater tank - Switch or Float..?I'd hate to be dependent on power to be able to flush a toilet. Could get stinky if the power company is a bit unreliable.
Ours is the kind with a switch - no idea… kek replied 24 September 2009 ago Site costs in relation to fill-please helpHi,
When we did our soil test, our site cam back as being a P class. With that, and the allowance for rock removal, (which we are more than likely to get most back), our… Emmsie replied 24 September 2009 ago Boltic Pine Lining BoardI would think a flooring type adhesive as its much more flexible. Liquid Nails do make a flooring adhesive as well. I guess the main thing is whether they are outdoor… Signing contract - building time in WASorry to hear that jaelee, sounds like you are having a stressful time.
We have just signed the contracts and been assured it won't take the time on the contract (375… Building Garage to The Boundry Wall
As you said its either 0cm or 1metre in Craigieburn. May I ask how you know the regulations in Craigieburn. Do you know someone who built home… kek replied 25 September 2009 ago
|