AU
Builder not committing on inspector!I think i understand what your saying, you want to use an inspector of your choice?
I think its bit late now, contracts signed. The inspectors, there chosen by the… Celebrations Build.Hey daturainoxia
For us the cost we have to get prepare for are after handover.
Paving, landscaping, painting, window treatments and soak wells. Things like is your… Choosing a builder in Perth?Hey banksiadream
I too am building in Banksia Grove. Yay.
As everyone has said a lot depends on your site manager. My mom and brother built with the same company. … Time Frames?From someone who has one of the worlds slowest builds it is definitely possible but you can only hope that's a worst case. On the upside, atleast they've been honest… Sarking through builderSarking would be a really high recommendation from me to get underneath a Colorbond roof. Sarking is essentially reflective foil, which is great under Colorbond, as it… Builder soak well...how important?Thanks for the replies, seems going through the builder is the way to go; especially hearing from someone having gone through both the options like Marcia.
Thanks Brooks Reach Nightmare
I am in stage 10 at Brooks Reach. The land was supposed to register Feb 2014 has been pushed back to May 2014 but it… matt or gloss tiles in bathroom/showerWe haven't even decided on a plan yet and I'm already wondering about this too I like the look of matt but think gloss can make it look bigger - not sure I'll ever be… Flat Roof Tiles - Monier HorizonThose flat tiles look amazing! I'm seeing more and more new homes here in Adelaide with them..or maybe it's just that I'm noticing them more now that I am doing my own… Ninka replied 3 May 2014 ago NinkaMay 03, 2014 6:08 pm NinkaMay 03, 2014 3:26 pm What did you do after handover?
First build:
Flooring
Gravel driveway (in a rural town and the house itself was on an unsealed road)
fencing
Split system a/c
Light fittings
Curtains &… Site cost infoHi everyone,
Just wondering in anyone could help me out with the site costs. I am currently in the process of finalising my design (and the builder). I've been told… Timber Framesive had 2 houses with timber frames and that whole thing about wood swelling is normally due to water damage but any good home should be built water tight and the… Beechwood homes - AdelaideOur experience, like everyone im sure, had its good and bad bits....
If I had my time again, I would not build with them is the simplest way of putting it... however at… BELLAHAVEN HOMES
Posting under a new account, but my old alias was Aquataine. The last udpate we had with Bellahaven homes was to come out and fix a few minor things which a rather… land contoursThanks Stewie, I rang the council and they said build 20mt from the front and think it was like 6mt from sides and back, not a problem as we have lots of room, and… Lorri replied 1 May 2014 ago LorriMay 01, 2014 11:13 am Phil2May 01, 2014 1:55 am Who is building with Beechwood Homes?we have selected PGH sorbetto its similar but an upgrade, they told us 1200 on the phone but im not sure if its $1200 or $12k......... was thinking of changing to urban… Compensation/Damages against builderNot sure if this the correct section but posting anyway. Looking for some advice from anyone who may know or has had a similar experience. We are seeking… sazzy91 started a topic 30 April 2014 ago Turn key timeline195 working days, which translates to 39weeks. They are still within the time-frame. I'm hoping to be one of the lucky ones who have 39 weeks as the very upper… 082013 replied 30 April 2014 ago Lakelands WA - siteworks??We are currently building with Contentliving in Lakelands and sitework is estimated at around $5k not much. Hope this helps. Colorbond Basalt Roof with Dune Render...Hi Doons
We have gone with Dune as the roof, vitesse as the main render, botany grey as the feature render, surfmist for the garage door and gully for the gutters. All… Other Builders Dumping Rubbish on my land.I have a similar problem at the moment with soil being dumped on my land and left there for a month. I emailed the builder last week and the soil should be removed today. ST13 replied 29 April 2014 ago ST13Apr 29, 2014 10:41 am Henley MonacoVic - by memory the cost for the extra width in the wall in the Living Room was $300 odd.
We are getting flyscreens included as part of… bradkApr 28, 2014 8:55 pm First build - needing some advise!If we build again (which is unlikely!) we'll have as much of the stuff that prevents you from moving in (e.g. flooring, paving and painting) done by the builder. Other… Building costVentura have been great so far. Only thing I regret is that I wish I would have pushed harder to have all my changes included before I signed up so I had a better idea on… House+Land Package with Casaview HomesAlready building with Casaview The quality inclusions plus the fixed price tender was our main reason for choosing them. Our house is at the frame stage and we have… NeilP replied 28 April 2014 ago NeilPApr 28, 2014 1:12 pm
|