AU
vincySep 17, 2009 8:56 am Sooty's house - Commodore Homes, Perth WA
Love the house Sooty.
Was wondering what colour(s) your gutters/fascia are? Are they also electra to match the render? My roof will also be black astral tiles and a… Class M Slab, different grades??Our soil report came back as requiring an M class (which was the standard inclusion) but we also had to pay an additional $3,000 as we required 21 piers due to the site… Porter Davis Site CostsHi
ours is a H class waffle slab $12800 close to 38 sq house includes piering and concreting the portico and alfresco.
excavation $3700
services $5740 due to large… mdzzj replied 17 September 2009 ago mdzzjSep 17, 2009 5:02 pm nelleSep 17, 2009 8:58 pm Single storey or Double Storeywe went double storey as it has a smaller footprint than a single storey and will allow us to have a bigger rear yard (much more room for a swimming pool). Also to take… Fixed price or cost plus option?
Have you at all considered demolition and construction from scratch, it could be worth a look at the cost of this too.
Hope this helps. … SYD-YYZ replied 17 September 2009 ago First home owners grant & boost.
Thanks for your answers, I will follow your recommended links. Talked also to the broker, she told me to assist with this form. BTW, I am in Victoria.
Chris cwoern replied 17 September 2009 ago Official informationDefinition of brick veneer:
Masonry veneer walls consist of a single non-structural external layer of masonry work, typically brick, backed by an air space. The innermost… Sierra replied 17 September 2009 ago Land title release date - Peet Innisfail
Hopefully title will be done before march. I think, limited circumstances the Commissioner may approve an extension to the commencement and completion date where the… mdzzjSep 18, 2009 1:17 pm First home builder, with sarah homesHi Jess,welcome!
My council has been doing the inspections for me so far, though I dare say that will end once lock-up has happened. The council noticed that the septic… issy jo replied 19 September 2009 ago Disaster...my driveway is too steep!Another thing that may help (and wish we did but hubby talked me out of it) is that the council were going to let us grind down the edge of the footpath 200mm from our… our designHi Bexi - With the photos I used our photo program to change the size to 600x800. I then uploaded to photobucket and copied/pasted the img link into the post.
Can't wait… R and R replied 19 September 2009 ago Slab pour and wind.Arh..
Interesting... is there sand around?
some of the coastal slabs we have done had to be delayed,
... because the finishing of the concrete is affected by the continued… Help to choose BORAL NOVO range BrickWe have used the Boral Nuvo Fusion Espresso Standard bricks.. They look awesome.. Will post some pics on my profile soon.. Garage done so far but we are really happy with them. EljaySep 20, 2009 11:00 am wrexySep 20, 2009 8:42 pm How do you know??You will always be able to find positive AND negative feedback for any builder if you look for it.
I think you have to of course, like the floorplan and it has to suit… themax replied 20 September 2009 ago kb46Sep 20, 2009 10:37 pm New Land Release- DoreenThe land is very flat on that release.
Was out there this morning where they are putting in services for the previously released stage. elastic replied 20 September 2009 ago Polystyrene with slab?Another function of the waffle pod is to absorb swelling in highly reactive soils. This prevents the slab from doming. ken007 replied 21 September 2009 ago Is this house expensive to build?Thanks for the explaination. We're at Fixed price contract stage so hopefully a lot of these items will be spelt out. But I'll ask the question about site specific costs. su ann replied 21 September 2009 ago 2paisSep 21, 2009 12:38 pm angelSep 21, 2009 1:57 pm DQH vs Burns vs build to lockupI have nothing but praise for DQH. My parents built with them back in 1991 and there is absolutely nothing wrong with the house today. I've been in rentals between 1 - 3… alk replied 21 September 2009 ago How long did you slab take?Our Site scrape was on the 4th of Sept, we still do not have trenches for the footings yet. We were sent a letter today requesting an extension in time (per clause what… TamDaz replied 21 September 2009 ago
|