Hi All Can someone please help me with the update for the stage 41 registration date.
Thanks Paul hutch started a topic 13 April 2018 ago hutchApr 13, 2018 2:17 pm Garden RetreatHi,
any more info on garden retreat.
Base cost
how much for site cost
how did the built go ?? Talk to me about Granvue homesIt took over 3 months do finish our final inspection and they still didn’t complete everything they had to pay us out and we got our own trades men in to fix it Brisbane Build with Dixon
Thanks gr8ly! Driveway and additional paths should be poured next Wednesday. Final inspection and handover end of next week if all goes according to plan. I think we are… Coral home Kirra 23 project
Hi Pablo sorry I did not receive your last notification regarding electrician... We are in Newie but when we spoke to him before rough in he asked us if we wanted to any… KDR Ryde NSW - Experience with rock??
Hi kitty. We are building with Rawson on a sloping (sideways) block in the Newcastle area. We are building a 42 square home for around that price so surely you can get… Casaview Homes
Hello,
Im new to this forum. Im building with Casaview homes. We have signed off on our prelim plan and doing all our colour selection and waiting for the estimator to… False p’board bulkhead???They haven’t put it in, so I have asked my site supervisor to have a look and get back to me!
- B
A vue of the pines on the Gold… Building with wisdom Homes
Thanks, my husband says the same. I'll just feel better once I can see it. This is our second build with wisdom but first double story so didn't put much thought into the… I think I would prefer the master bedroom no. 6 for size but for orientations of the components of the master bedroom no. 1 or 2. Because I think privacy is more important… Contract and Building Permit questionHi,
I assume I will have to sign the contract and pay the 5% deposit before building permit is applied?
Also, Normally we should only demolished the house when we… MyFirst started a topic 9 April 2018 ago jai.mApr 09, 2018 8:30 pm Hi all, we have been lurking around this forum for a while and getting some great ideas from everyone.
We have just started the process of designing a two storey home… DanALApr 09, 2018 5:53 pm Metricon contract signing and issues
This is pretty much the case. Building with M at the moment, and they pretty much only do things as PCV's
Trying to get finalised plans with exactly everything corrected… Metricon Contract Process Harpley
When we did it last year, we signed the incorrect contract and then a variation. The contract was never redone. This just seems to be how they do it, and the risk to… Open WIP or door to WIP??
Anything where you can see into open pantry shelving I’m a big fan of a door. If you were putting cabinetry in then open. My pantry shelves aren’t tidy enough for me… JG King - Madison 2Looks good!
Thanks for the photos - it's helped confirm our choice to go with the Lemon Spotted Gum as well. occupancy certificateHi. I'm just after some advise. Our build has gone over our contract time and the two extensions of time the builder has given us. We had our independent inspector go… lolly72 started a topic 7 April 2018 ago Engineering plansBeing educated on what you want and understanding the process to get it there is important... also get your head around how your going to furnish it so you get all of your… Clean up site and door heightsJust checking what is acceptable clean up before handover , we have alot of stuff that got dug into holes around house and buried like metal beams that will be a nice… Gregory hills parklands releaseYup excellent news gives me a bit of relief. Thanks for your advise mate i will keep updating this forum on how construction goes. Nazar replied 6 April 2018 ago NazarApr 06, 2018 8:18 am Feedback on house plan
yeah I like the idea of the skylight, perhaps positioned between kitchen island and dining table. All flooring finished today really happy with my choices in carpet EC Residence 26 100% wool and Karndean Lemon spottedgum vinyl floor planks.
Signed Initial Working Drawings IncorrectDid you notice that on the initial plan it says 1.5m high and the second says 1.0m high. Even with the extra length, it should cost less to do the second longer lower wall… The ivy, Doreen
Hi Ivy Residents.
We have a Facebook group for the Ivy Estate Residents (Doreen, VIC). Please if you are an estate owner, come an join our group. You must answer our… jessmApr 05, 2018 11:01 am Henley Monterey 28Think again if you are going to build with Henley.
This is my recent experience.
There was a water leakage from the roof along the walls. I contacted Hanley emergency… tash089 started a topic 5 April 2018 ago Building with Jandson HomesBeen looking through here for some time, long time lurker, first time poster.