wingzee
26 February 2019
18554
Feb 26, 2019 4:10 pm
Hi, Is there anyone ever go to legal action with Clarendon ? I have talked to Solicitor, Lawyer and Fair Trading, but I need further advise before proceeding to legal 100% full-on. Cheerz.. Hi wentworth33, we went the Fair Trading route and managed to have a favorable outcome for our case.
Hi wentworth33, we went the Fair Trading route and managed to have a favorable outcome for our case.
Read PostLike
wingzee
20 August 2018
18495
Aug 20, 2018 6:38 am
i understand from other forums that they do include days with the roof on. are you sourcing your rain data from BOM ? Hi yes sourced from BOM ie. closest weather station.
Hi yes sourced from BOM ie. closest weather station.
Read PostLike
1 person likes this.
wingzee
19 August 2018
18493
Aug 19, 2018 7:58 pm
So we have finally moved in! Handover was 3 weeks ago - some notable defects still but wasn’t anything major ie. lower staircase hand rail wasn’t installed and silicone for shower screens missing etc. We managed to claim some liquidated damage due to the delay but wasn’t pleased with the amount as t...
So we have finally moved in! Handover was 3 weeks ago - some notable defects still but wasn’t anything major ie. lower s...
Read PostLike
wingzee
24 July 2018
18476
Jul 24, 2018 4:35 pm
Anyone has any idea how long does the certifier that Clarendon uses needs to issue a Final Occupancy Cert once inspection been made and it’s satisfactory?
Anyone has any idea how long does the certifier that Clarendon uses needs to issue a Final Occupancy Cert once inspectio...
Read PostLike
wingzee
3 June 2018
18467
Jun 03, 2018 12:15 pm
Well.. I assumed that each building design has its own contractor and each contractor has its own performance. Hence performance difference but following Clarendon guidelines. Does it make sense? Therefore, cannot generalise all contractor are the same. each individual works differently, even they ...
It does makes sense but shouldn't quality associated with a builder is expected to be consistent throughout, regardless...
Read PostLike
wingzee
27 May 2018
18460
May 27, 2018 4:06 pm
Walkthrough slated on 31st with indicative handover on 7th June - no longer happening. SS called yesterday to inform that we looking at possibly another week or so (we wouldn’t be holding our breath knowing how Clarendon operates). Local certifier failed our build yesterday due to uneven steps at g...
What is your building designname? Clarendon is only a project builder, they hire contractor to build the house. Each bu...
Read PostLike
wingzee
27 May 2018
18458
May 27, 2018 11:50 am
Walkthrough slated on 31st with indicative handover on 7th June - no longer happening. SS called yesterday to inform that we looking at possibly another week or so (we wouldn’t be holding our breath knowing how Clarendon operates). Local certifier failed our build yesterday due to uneven steps at ga...
Walkthrough slated on 31st with indicative handover on 7th June - no longer happening. SS called yesterday to inform tha...
Read PostLike
wingzee
30 April 2018
18450
Apr 30, 2018 4:49 pm
@Wingzee - What colour is your grey wall paint? Hi nissy it's Gemini Silver. Just met up with the AS few hours ago and did a brief unofficial walkthrough of our build. Been told our new SS will be assigned next week (name starts with D) but AS will still be involved for the walkthrough with us and ...
Hi nissy it's Gemini Silver. Just met up with the AS few hours ago and did a brief unofficial walkthrough of our build....
Read PostLike
wingzee
25 April 2018
18443
Apr 25, 2018 9:04 am
https://forum.homeone.com.au/u/74642_1524610994.jpeg https://forum.homeone.com.au/u/74642_1524611021.jpeg https://forum.homeone.com.au/u/74642_1524611030.jpeg https://forum.homeone.com.au/u/74642_1524611056.jpeg https://forum.homeone.com.au/u/74642_1524611065.jpeg
Read PostLike
wingzee
25 April 2018
18442
Apr 25, 2018 9:02 am
Update from our trip last weekend. We now have got electricity (power points, lighting), plumbing (taps, sinks, shower screens, toilet suites), alarm, internal wall painting (partially completed) Pending items (from what we noticed): -Internal wall painting -Door locks -Security doors -External rend...
Update from our trip last weekend. We now have got electricity (power points, lighting), plumbing (taps, sinks, shower s...
Read PostLike
wingzee
20 April 2018
18441
Apr 20, 2018 9:08 pm
Just finished my PCI. Took 5.5 hours to go through our double story house, so be sure to book in enough time for it Wingzee are you building in Kellyville? Our supervisor SB just got moved there and he's been really good for us. Yes myself and another forummer here whom got delayed as our SS left. ...
Yes myself and another forummer here whom got delayed as our SS left. Both in Kellyville. Thanks for the info and great...
Read PostLike
wingzee
13 April 2018
18436
Apr 13, 2018 12:00 pm
Thanks both. We plan to claim it ourselves as the contract clauses are pretty straight forward and we are pretty sure it did not rain much during the first 6 months of construction before the roof was up, apart from few public holidays in between the delay is unacceptable. We will wait till the new ...
Thanks both. We plan to claim it ourselves as the contract clauses are pretty straight forward and we are pretty sure it...
Read PostLike
wingzee
11 April 2018
18431
Apr 11, 2018 5:43 pm
So we been given an indicative handover date (early June) which will be exactly 12 months (started in June last year) since we started construction. Has anyone experienced such and been successful in claiming for the delay expenses? We were initially told a handover date in April. That’s way over th...
So we been given an indicative handover date (early June) which will be exactly 12 months (started in June last year) si...
Read PostLike
wingzee
9 April 2018
18427
Apr 09, 2018 8:20 pm
Hi, Can I ask about the different ducted aircon systems people purchased? We're building the Bronte and currently on the plans they have the air con unit out the back but we want it on the side of the house as we plan to put a pool out back down the track. At Tender they weren't sure that the plann...
Hi hanes, Structural changes can still be made post-contract. We had our kitchen window missing from our contract plans...
Read PostLike
wingzee
9 April 2018
18424
Apr 09, 2018 4:36 pm
Hi Ras, yes the Colour Studio was wherre we got our inspiration from. Couldn’t recall how much it costs for the upgrade to Createc Gloss & the “Char Oak” black colour but the whole kitchen, butler’s pantry and laundry costs us $27k. Yes the window splashback is a freebie from the Summer of Free...
Wingzee, how's your build coming along, have you had your PCI/handover yet? Unfortunately nope. Just got the news that ...
Read PostLike
wingzee
9 April 2018
18422
Apr 09, 2018 2:46 pm
Hi Ras, yes the Colour Studio was wherre we got our inspiration from. Couldn’t recall how much it costs for the upgrade to Createc Gloss & the “Char Oak” black colour but the whole kitchen, butler’s pantry and laundry costs us $27k. Yes the window splashback is a freebie from the Summer of Free ...
Hi Ras, yes the Colour Studio was wherre we got our inspiration from. Couldn’t recall how much it costs for the upgrade ...
Read PostLike
wingzee
24 March 2018
18417
Mar 24, 2018 5:22 pm
Anyone has any idea how advance does Clarendon provides a handover date? We been told it’s slated for 1st week of April with no specific date given yet. That’s like 2 weeks away?
Anyone has any idea how advance does Clarendon provides a handover date? We been told it’s slated for 1st week of April ...
Read PostLike
wingzee
7 March 2018
18396
Mar 07, 2018 5:52 am
Nice! Wingzee - do you remember how much your pull-out spice rack cost? Would love to add it in... That costs us $750 ;)
That costs us $750
Read PostLike
wingzee
7 March 2018
18395
Mar 07, 2018 5:48 am
wingzee can i see some more pics? and how long has your build taken to date? That’s pretty much what we took! Any particular photos you’re after?
That’s pretty much what we took! Any particular photos you’re after?
Read PostLike
wingzee
7 March 2018
18394
Mar 07, 2018 5:48 am
Nice! Wingzee which suburb are you in and was it a KDR? North Kellyville. It’s a new build. Been 9 months! That's similar to ours! I think we started around the same time. We are building in Leppington and just had our bathrooms tiled and grouted. Cabinets installed but no garage door. This week th...
North Kellyville. It’s a new build. Been 9 months That's similar to ours! I think we started around the same time. We a...
Read PostLike




Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024