Home
Pros
Forum
  • About
  • Join Community
  • Contact
Reply
WatchingStarredHistory
InboxSent
MembersPros
#Unanswered     #Active
Posts
Kazpien
6 Posts

Follow

Kazpien

Joined 5 June 2020
Junior Member
Send Message
Filter Results
TopicsPostsRecentTitleForum
Posts
Kazpien
17 June 2020
7
Jun 17, 2020 5:41 pm
I've had a resin injection company take a look but they have not been able to offer a solution. The resin has limited capability in closing a gap of around 70mm and levelling lifted pathway. The four figure quote I received came without any guarantee.
I've had a resin injection company take a look but they have not been able to offer a solution. The resin has limited ca...
Read PostLike
Kazpien
8 June 2020
5
Jun 08, 2020 10:44 pm
No, it's the eastern side of the block. Downpipe drains into a drainage pit that discharges into a storm water drain at the street front of the property.
No, it's the eastern side of the block. Downpipe drains into a drainage pit that discharges into a storm water drain at ...
Read PostLike
Kazpien
6 June 2020
3
Jun 06, 2020 10:02 pm
Does this imply that pouring all in one go offer improved structural integrity over a two stage pour where the piers are done first followed by the surface layer in 24hours?I cant see to get a consensus on this from local concrete specialists.
Does this imply that pouring all in one go offer improved structural integrity over a two stage pour where the piers are...
Read PostLike
Kazpien
6 June 2020
1
Jun 06, 2020 3:39 pm
I have a concretor proposing to undertake the demolition, removal and re-laying of aggregate finish concrete in one day. This work entails dowelling, piering as well as well as the provision of strip footing and re-laying of concrete to achieve exposed aggregate finish covering an area of around 20s...
I have a concretor proposing to undertake the demolition, removal and re-laying of aggregate finish concrete in one day....
Read PostLike
Kazpien
5 June 2020
3
Jun 05, 2020 10:27 pm
I’ve a 19m length of aggregate finished pathway along the length of my House. Its been down for 13yrs but in recent yrs it has begun to lift and open up a gap of around 75mm. If I have the path relaid with suitably spaced dowels and piers should that give me the peace of mind to ensure that I have ...
The site was filled to a height of 1m but I suspect may not have been adequately compacted at the time since it is loca...
Read PostLike
Kazpien
5 June 2020
1
Jun 05, 2020 3:32 pm
I’ve a 19m length of aggregate finished pathway along the length of my House. Its been down for 13yrs but in recent yrs it has begun to lift and open up a gap of around 75mm. If I have the path relaid with suitably spaced dowels and piers should that give me the peace of mind to ensure that I have r...
I’ve a 19m length of aggregate finished pathway along the length of my House. Its been down for 13yrs but in recent yrs ...
Read PostLike




Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024