Hey @asahi_home Many engineers also have building licenses that do structural repairs (booming business) Track down one locally .. BTW, that's an easy fix ask the engineer for the causes, data/proofs And you'll feel relieved that you got someone you can trust to fix it. Cheers Chris Hi Chris Thanks...
Hi Chris Thanks for the advice. Should I be searching for a Structural Engineer?
Read PostLike
asahi_home
1 May 2021
9
May 01, 2021 3:09 pm
Hi Simeon I'm in Melbourne. What are rough prices to get a structural engineer to do an inspection? And yes these were the cracked bricks outside the same wall. Metricon already replaced the bricks https://forum.homeone.com.au/u/82972_1619789278.jpg And here is another example of cracks to a door w...
Lucky Metricon offer a life time structural guarantee as I think you are going to need it! sorry to say I would expect ...
Read PostLike
asahi_home
30 April 2021
6
Apr 30, 2021 11:30 pm
Hi Simeon I'm in Melbourne. What are rough prices to get a structural engineer to do an inspection? And yes these were the cracked bricks outside the same wall. Metricon already replaced the bricks https://forum.homeone.com.au/u/82972_1619789278.jpg And here is another example of cracks to a door wh...
Hi Simeon I'm in Melbourne. What are rough prices to get a structural engineer to do an inspection? And yes these were t...
Read PostLike
asahi_home
28 April 2021
3
Apr 28, 2021 9:23 pm
Get an engineer to take a look. That's significant. Also if they keep patching, the cracks will never be bigger than 1.5mm. Remind them about the softley case in your next chat. Should I get a private engineer to have a look at that or push Metricon to get their engineer to do it. And who should be...
Should I get a private engineer to have a look at that or push Metricon to get their engineer to do it. And who should ...
Read PostLike
asahi_home
28 April 2021
1
Apr 28, 2021 9:09 pm
I've built a double storey house with Metricon and it's been roughly 2 years since it was handed over. There've been cracks forming in the interior walls and most of them are either at an angle or horizontal to the corner of the windows. The wall shown in the photo was cracked inside and the bricks ...
I've built a double storey house with Metricon and it's been roughly 2 years since it was handed over. There've been cra...
Read PostLike
asahi_home
24 May 2019
1
May 24, 2019 4:05 pm
Hi there, I just had a double colorbond gate installed. Some cement were poured around the latches to act as an anchor because the latches do not reach the ground. This did not even last a day. The wind blew the gate open. The gate was done at this height because of my concrete path around the house...
Hi there, I just had a double colorbond gate installed. Some cement were poured around the latches to act as an anchor b...
Read PostLike
asahi_home
9 May 2019
1
May 09, 2019 7:46 pm
Hi there, The builder finished installing the roof on the house, but I noticed an aluminium foil sheet which was installed from the inside of the roof. Would anyone know what this foil is used for and why is it not covering the whole internal of the roof Thanks https://forum.homeone.com.au/u/1_15573...
Hi there, The builder finished installing the roof on the house, but I noticed an aluminium foil sheet which was install...
Read PostLike
asahi_home
29 April 2019
1
Apr 29, 2019 9:56 pm
Hi there, I need some advice on some rusty flashing. I went through my PCI and my private inspector found that the flashing around the house were rusty. This happened because when they cleaned the bricks, they've used some acid solution which damaged the flashing and made them rusty. The private ins...
Hi there, I need some advice on some rusty flashing. I went through my PCI and my private inspector found that the flash...
Read PostLike
1 person likes this.
asahi_home
24 February 2019
1
Feb 24, 2019 10:40 pm
Hi there, I've seen few places in my new home during an inspection, that the termite barrier is visible. Can these be left like that or should they be covered? Thanks https://forum.homeone.com.au/u/82972_1551011974.jpg https://forum.homeone.com.au/u/82972_1551011978.jpg https://forum.homeone.com.au/...
Hi there, I've seen few places in my new home during an inspection, that the termite barrier is visible. Can these be le...
Read PostLike
asahi_home
24 February 2019
1
Feb 24, 2019 10:27 pm
Hi there, There is a timber post stirrup installed for my new home's alfresco. My private inspector picked that up and stated that the bolts in the concrete should be straight down instead at an angle as shown in the photo. My builder is saying that as they couldn't put the bolts straight down, they...
Hi there, There is a timber post stirrup installed for my new home's alfresco. My private inspector picked that up and s...
Read PostLike
asahi_home
15 February 2019
1
Feb 15, 2019 3:43 pm
Hi All, What would you recommend if there was a gap in between the window frame and the bricks. I know that an infill can be added to the top of the frame. Would that affect the insulation of the window frame if only an infill is added versus no gap at all? I've seen the same in almost all windows o...
Hi All, What would you recommend if there was a gap in between the window frame and the bricks. I know that an infill ca...
Read PostLike
asahi_home
29 January 2019
6
Jan 29, 2019 9:26 pm
PCI is really identifying the main defects before handover. You will need to check the items carefully before the Handover. It is very common to not fit appliances until handover day to minimise the possibility of theft Your house is most vulnerable to theft on the night of handover as there will b...
I have scheduled a private inspection just before the walk through and I wanted most of the items to be completed so th...
Read PostLike
User avatar  likes this
asahi_home
29 January 2019
5
Jan 29, 2019 9:22 pm
1) formally ask for install dates of the 5 items 2) formally schedule a PCI specifically for the 5 items once done It is common to have the appliances to be done very last...even after PCI...just before handover. That's a good idea thanks
That's a good idea thanks
Read PostLike
asahi_home
29 January 2019
1
Jan 29, 2019 12:18 pm
Hi All, I have my PCI scheduled with Metricon this week and looks like the driveway and concrete path around the house will be done after the PCI. I was wondering how many of the items in the contract can be left uncompleted at the PCI. This is a list of items that I know will not be completed by th...
Hi All, I have my PCI scheduled with Metricon this week and looks like the driveway and concrete path around the house w...
Read PostLike
asahi_home
2 January 2019
1
Jan 02, 2019 5:13 pm
Hi All, I went to check on the house which is currently in completion stage. When I reached there the front door which does not have a lock yet, was opened. The front door is only being held by a pile of tiles. When I checked inside, some walls were vandalised with graffiti. I hope this can be fixed...
Hi All, I went to check on the house which is currently in completion stage. When I reached there the front door which d...
Read PostLike
asahi_home
11 December 2018
6
Dec 11, 2018 12:37 pm
The inspector really needs to stress to Metricon that this is an Australian Standard and work should not have proceeded without the inspection report. A meeting should be arranged on site with the Inspector, the supervisor and the construction manager from Metricon to ensure that is has been comple...
Thanks for your information. I've already asked the independent inspector (from Darbecca) to contact my site manager to...
Read PostLike
asahi_home
11 December 2018
4
Dec 11, 2018 12:18 pm
hi I think that you should be compensated as this is a requirement AS3740 (Australian Standard Waterproofing of Domestic Wet areas). You should have your Independent inspector help you with receiving your compensation so you're not left fighting alone. As an Independent inspector I see this all the...
Hi there, I'm going to send a letter of complaint to Metricon which includes an email from the independent inspector ex...
Read PostLike
asahi_home
11 December 2018
1
Dec 11, 2018 7:53 am
Hi All, I booked a pre-plaster/fixing and waterproofing inspection for my house and the inspection was cancelled because the tiling work has already started when the independent inspector arrived on site and could not proceed with his checks. I've already confirmed the inspection with my site manage...
Hi All, I booked a pre-plaster/fixing and waterproofing inspection for my house and the inspection was cancelled because...
Read PostLike
asahi_home
4 December 2018
4
Dec 04, 2018 12:15 pm
I would prefer that defects are found and fixed before handover for the waterproofing. I understand that the builder does inspections but based on previous stages, my independent inspector has found numerous defects despite the fact that the builder did their inspection How important is the waterpro...
I would prefer that defects are found and fixed before handover for the waterproofing. I understand that the builder doe...
Read PostLike
asahi_home
2 December 2018
1
Dec 02, 2018 9:44 pm
Hi All, I booked a pre-plaster/fixing and waterproofing inspection for my house. My site manager was already aware of the date and time that the inspection will happen. However when the private inspector arrived at the house, tiling already started which prevent him to access the house for the inspe...
Hi All, I booked a pre-plaster/fixing and waterproofing inspection for my house. My site manager was already aware of th...
Read PostLike




Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024