Home
Pros
Forum
  • About
  • Join Community
  • Contact
Reply
WatchingStarredHistory
InboxSent
MembersPros
#Unanswered     #Active
Posts
jol0
220 Posts

Follow
Go to page 1, 2, 3, 4, 5 ... 11

Posts
jol0
9 November 2018
14558
Nov 09, 2018 12:33 pm
They don't have a copy of our PCI [emoji34][emoji34][emoji34][emoji34][emoji34]
They don't have a copy of our PCI
Read PostLike
jol0
1 November 2018
14557
Nov 01, 2018 3:47 am
Hi everyone, long time since I've posted here. We've been in our place for a few months now. Still a few outstanding issues to resolve. We had our 90 day maintenance check yesterday and it appears in all the excitement of moving, we were never given our PCI paperwork with the list of noted defects. ...
Hi everyone, long time since I've posted here. We've been in our place for a few months now. Still a few outstanding iss...
Read PostLike
jol0
6 September 2018
14554
Sep 06, 2018 9:32 am
Our process from demolishing to keys was 22 months. Also we are finding heaps of quality issue. All the windows, sliding doors and their frames have either significant glass scratches, acid wash damage or the frames are shredded and scratched. All our drains were blocked and I knew to check for thi...
Hi jol0 That’s terrible, I suspect we will have the same problems. Did you use an independent building inspector to spo...
Read PostLike
jol0
5 September 2018
14552
Sep 05, 2018 8:57 am
Our process from demolishing to keys was 22 months. Also we are finding heaps of quality issue. All the windows, sliding doors and their frames have either significant glass scratches, acid wash damage or the frames are shredded and scratched. All our drains were blocked and I knew to check for this...
Our process from demolishing to keys was 22 months. Also we are finding heaps of quality issue. All the windows, sliding...
Read PostLike
jol0
7 August 2018
14548
Aug 07, 2018 12:36 pm
[quote="ms_jd"]Biggest regret going with Masterton. We are building a duplex at south west Sydney. Our site has been sitting without a roof for 8 months now, half *** job done on the bricks, not even completed. Surely the wear and tear from the frames being exposed is not acceptable? Been...
By the way, what's caused the delays. We have just received our CC to start building a duplex near Parramatta and your ...
Read PostLike
jol0
7 August 2018
14546
Aug 07, 2018 11:07 am
[quote="ms_jd"]Biggest regret going with Masterton. We are building a duplex at south west Sydney. Our site has been sitting without a roof for 8 months now, half *** job done on the bricks, not even completed. Surely the wear and tear from the frames being exposed is not acceptable? Been...
By the way, what's caused the delays. We have just received our CC to start building a duplex near Parramatta and your ...
Read PostLike
jol0
7 August 2018
14543
Aug 07, 2018 10:02 am
Biggest regret going with Masterton. We are building a duplex at south west Sydney. Our site has been sitting without a roof for 8 months now, half *** job done on the bricks, not even completed. Surely the wear and tear from the frames being exposed is not acceptable? Been through 3 site superviso...
By the way, what's caused the delays. We have just received our CC to start building a duplex near Parramatta and your ...
Read PostLike
jol0
22 July 2018
14538
Jul 22, 2018 2:02 pm
So we've finally started the big move in. Only took 22 months since we moved out of our original house to knock it down..! Now that we are in the house, I've started noticing defects. One of the main things being long streaks down the windows which don't clean off. Hubby thinks they may be stains fr...
So we've finally started the big move in. Only took 22 months since we moved out of our original house to knock it down....
Read PostLike
jol0
9 July 2018
14535
Jul 09, 2018 12:54 pm
Yep we just had another quote.. 9.5k. Both quotes include extending some steps and curving the driveway around to the front step. The original guy ended up quoting 12.5k!!
Yep we just had another quote.. 9.5k. Both quotes include extending some steps and curving the driveway around to the fr...
Read PostLike
jol0
8 July 2018
14532
Jul 08, 2018 11:26 am
Thanks! Just wondering what everyone paid for their driveway??? We received a quote which seems exorbitant..11 to 12k..! Here's the area https://uploads.tapatalk-cdn.com/20180708/e012199d31becda16d6055729027fc47.jpg
Thanks! Just wondering what everyone paid for their driveway??? We received a quote which seems exorbitant..11 to 12k..!...
Read PostLike
jol0
30 June 2018
14529
Jun 30, 2018 11:42 pm
We finally got our keys...after 18 months of construction..! Can anyone recommend a good driveway guy and landscaper?? We're in the parramatta region. Any suggestions would be greatly appreciated.
We finally got our keys...after 18 months of construction..! Can anyone recommend a good driveway guy and landscaper?? W...
Read PostLike
1 person likes this.
jol0
4 June 2018
14526
Jun 04, 2018 9:07 am
After taking 60 weeks to build a Villina Elite, keys were handed over 60 weeks ago and M have barely done 3/4 of the items outstanding then, with all rooms now usable after taking 8 months to send an electrician. I don’t want to go into detail, but poor work at installation has 2 major items requir...
woww! you poor thing! can I ask why did you sign PCI and final inspections when there were so many issues? one of our d...
Read PostLike
jol0
22 April 2018
14505
Apr 22, 2018 6:36 pm
Just wondering generally how long should PCI be after gyprock, skirting and doors?
Just wondering generally how long should PCI be after gyprock, skirting and doors?
Read PostLike
jol0
9 April 2018
14503
Apr 09, 2018 1:10 pm
Another thing I noticed, do any of you with a double storey have a skirting board running through your stairwell between the gyprock of the first and second floor? I remember someone on here arguing with their ss about it. Why do they do this!?
Another thing I noticed, do any of you with a double storey have a skirting board running through your stairwell between...
Read PostLike
jol0
5 April 2018
14502
Apr 05, 2018 5:43 pm
If it was just a matter of turning the doors, it sounds simple enough! Hopefully that’s all it takes!! I imagine it can't be super complicated..!
I imagine it can't be super complicated..!
Read PostLike
jol0
5 April 2018
14500
Apr 05, 2018 5:35 pm
Oh and I was super pleased to cross paths with our kitchen installer today. He was on site working on the granny flat kitchen, I mentioned I wanted the kitchen cabinets in the main house turned so that the timber grain married up (looked continuous). He mentioned that they don't really make the doo...
jol0 ...... this was the post from martinsharmony about their kitchen...... hope it helpsThank you! Ah bugger..So it wa...
Read PostLike
jol0
5 April 2018
14497
Apr 05, 2018 11:06 am
I would want the grain to match up ..... it would do my head in if they didn’t!! [emoji15][emoji15][emoji15] Haha yeah I agree. It's a fight I'll have to have later it seems.
Haha yeah I agree. It's a fight I'll have to have later it seems.
Read PostLike
jol0
5 April 2018
14494
Apr 05, 2018 10:57 am
For those of you who got a horizontal ravine finish for your cupboards, did they install them so the grain follows the cupboards or did they just stick them randomly anywhere? Did you have a preference? I remember someone on here had to argue with their ss to get it changed from random grain to a sm...
For those of you who got a horizontal ravine finish for your cupboards, did they install them so the grain follows the c...
Read PostLike
jol0
13 March 2018
14491
Mar 13, 2018 7:25 pm
Hi all, if anyone here has gone to fair trading over delays with m can you please contact me privately on here. Thanks.
Hi all, if anyone here has gone to fair trading over delays with m can you please contact me privately on here. Thanks.
Read PostLike
jol0
31 January 2018
14421
Jan 31, 2018 7:06 am
I've been fairly quiet on here reading some of the newbies posts but I feel compelled to warn you all. If you think pre construction is lengthy just digest this: we've been in construction with our slab poured since January 2017. Over a year. And we are not at lock up. We are in sydney. Happy to pm ...
I've been fairly quiet on here reading some of the newbies posts but I feel compelled to warn you all. If you think pre ...
Read PostLike




Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024