steel
30 October 2019
12
Oct 30, 2019 1:17 pm
Anyone has thoughts on changes to site supervisor during construction? They told us exactly the same a couple of months in and changed supervisor.Was relatively early as well though just after around brickwork from memory. Didnt end badly for us though. Cant really give much more info than that. I ...
They told us exactly the same a couple of months in and changed supervisor.Was relatively early as well though just aft...
Read PostLike
steel
18 August 2019
76
Aug 18, 2019 11:29 am
Thanks Steel, just one last question with your 2nd storey, is it all brick or panel with suspended concrete floor? and how do you find the outside noise & temperature if the 2nd storey walls are panel? The astronomical part worries me too. It is so confusing, they seem to be able to build cheap...
panel with suspended concrete floor Outside noise and heat was a worry for me. I upgraded upstairs windows to laminated...
Read PostLike
steel
7 August 2019
74
Aug 07, 2019 11:42 am
Did you have direct contact with the site supervisor? Did you have an independent building inspector and how do you know what stages to get them to inspect? No. Was only through their office. We had 4 meeting with site super on site. No I did not. The cost was astronomical in my eyes and I did not ...
No. Was only through their office. We had 4 meeting with site super on site. No I did not. The cost was astronomical in...
Read PostLike
steel
6 August 2019
72
Aug 06, 2019 4:10 pm
Sorry for the late reply. Yes I would build with them again. We had some small issues during design which was rectified before construction. Construction went really well, super quick and quality has been outstanding. After care service for minor issues has been quite good. Benchmark spec on a house...
Sorry for the late reply. Yes I would build with them again. We had some small issues during design which was rectified ...
Read PostLike
steel
10 July 2019
83
Jul 10, 2019 3:44 pm
I think it was about $700 for 1m length with fittings so general ballpark might suggest $2.1k for ya?
I think it was about $700 for 1m length with fittings so general ballpark might suggest $2.1k for ya?
Read PostLike
User avatar  likes this
steel
10 July 2019
81
Jul 10, 2019 2:06 pm
Recommend hte IKEA PAX system if you can find something that fits the space. It might cost a bit but its heaps cheaper than custom! Like at least half the cost. That worked out best for us even though we had very limited space.
Recommend hte IKEA PAX system if you can find something that fits the space. It might cost a bit but its heaps cheaper t...
Read PostLike
User avatar  likes this
steel
5 July 2019
26
Jul 05, 2019 3:41 pm
Little late these days. Just got my keys and moved in :D
Little late these days. Just got my keys and moved in
Read PostLike
steel
28 June 2019
68
Jun 28, 2019 5:27 pm
Hey, do you know what the paint brand was? We're in a similar spot soon, having to do the wall paint. We used their recommended. It says Permalux Premium Architectural Coatings Supacoat. We picked Solvers Spirit Grey colour. The amazing Sealer they had was called Supaseal by Topdeck.
We used their recommended. It says Permalux Premium Architectural Coatings Supacoat. We picked Solvers Spirit Grey colo...
Read PostLike
steel
28 June 2019
2
Jun 28, 2019 1:18 pm
Just built there. Seems nice enough. There's older and newer areas. From what I understand, they spread out Homeswest housing these days do there's probably bound the be some. Just like anywhere. Go for a drive through there.
Just built there. Seems nice enough. There's older and newer areas. From what I understand, they spread out Homeswest ho...
Read PostLike
steel
28 June 2019
66
Jun 28, 2019 12:21 pm
http://imgur.com/a/evV5dtc Album with latest photos. Still dont have concrete or all our light fittings or taps in yet. Our curtsins currently getting hemmed as well. Getting through it though! Move in day tomorrow.
http://imgur.com/a/evV5dtc Album with latest photos. Still dont have concrete or all our light fittings or taps in yet....
Read PostLike
steel
27 June 2019
64
Jun 27, 2019 5:43 pm
Wow. You HAVE been busy. Your kitchen looks great, as do the floors. Proline Stamford is one I had considered but decided against hybrid because I don’t want the beading around the bottom of the island breakfast bar? And do you skirtings still have to be installed? Looking forward to seeing more ph...
We decided to stick with just the scotia. They had not installed them by the time of that photo but its in now. Ill tak...
Read PostLike
steel
27 June 2019
62
Jun 27, 2019 1:53 pm
So just got the new house on Tuesday last week so I have been in absolute beast mode in terms of achieving things. Ill have to take photos tomorrow of half the stuff as I don't have them somehow yet. Too tired to think after finishing it all. One photo of our flooring laid. https://forum.homeone.co...
So just got the new house on Tuesday last week so I have been in absolute beast mode in terms of achieving things. Ill h...
Read PostLike
steel
21 June 2019
61
Jun 21, 2019 2:25 pm
Key Handover was on Tuesday so now we can come and go as we please. Our flooring contractors started on Thursday and our Electrician on Wednesday so we had to rush around and get as much painting done as possible. We smashed out most of our main living room and laundry and entry hall way but we are ...
Key Handover was on Tuesday so now we can come and go as we please. Our flooring contractors started on Thursday and our...
Read PostLike
steel
13 June 2019
60
Jun 13, 2019 5:33 pm
So we did our PCI. Only minor cosmetic work, plus a couple of shower screens and mirrors to install and we would have been fine. That was over a week ago now and currently getting sandbagged. Told they wont be ready till next week which throws out some of our post handover planning out and now we wi...
So we did our PCI. Only minor cosmetic work, plus a couple of shower screens and mirrors to install and we would have be...
Read PostLike
steel
10 June 2019
1090
Jun 10, 2019 12:50 pm
Very situational on Ducted Vacuum. I personally dont rate it and wouldnt get one. We have one in our current house.
Very situational on Ducted Vacuum. I personally dont rate it and wouldnt get one. We have one in our current house.
Read PostLike
steel
28 May 2019
59
May 28, 2019 9:56 pm
Wow how exciting that’s it’s all almost done!! Are they painting the walls for you or are you getting a contractor in afterwards to paint? They are painting upstairs and frames. We are doing the downstairs ourselves.
They are painting upstairs and frames. We are doing the downstairs ourselves.
Read PostLike
steel
28 May 2019
56
May 28, 2019 9:35 pm
Yeah it does seem quite ambiguous. Noone really says. But I am not going to allow obvious chunks or extras that should have been dry scraped afterwards.If it feels like sandpaper, its probably too much as well :P
Yeah it does seem quite ambiguous. Noone really says. But I am not going to allow obvious chunks or extras that should h...
Read PostLike
steel
28 May 2019
54
May 28, 2019 9:13 pm
PCI will be next week. The only downside I have NOTICED so far is that the plastering has been a fair bit average in places. Everything else so far looks good. I am looking forward to seeing all the finishes in there.
PCI will be next week. The only downside I have NOTICED so far is that the plastering has been a fair bit average in pla...
Read PostLike
steel
17 May 2019
52
May 17, 2019 11:49 pm
Latest Update Photos https://photos.app.goo.gl/ULRVkXCV85NYf87K7 Tilings Mostly Done Electrical Fitouts Mostly Done Plumbing Fitout is Mostly Done Definitely at the pointy end. We have been told early June for first practical completion inspection. We had an brickie come in and build a wall in our b...
Latest Update Photos https://photos.app.goo.gl/ULRVkXCV85NYf87K7 Tilings Mostly Done Electrical Fitouts Mostly Done Plum...
Read PostLike
User avatar  likes this
steel
16 May 2019
50
May 16, 2019 9:03 pm
Does seem to be the way with most builders though. They always love leaving fat on either side and never want multiple trades working together. We are so close to ours being done and it wouldnt take them more than 4-5 days if they didnt stuff around but they quote us 4 weeks instead :D
Does seem to be the way with most builders though. They always love leaving fat on either side and never want multiple t...
Read PostLike
User avatar  likes this




Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024