Home
Pros
Forum
  • About
  • Join Community
  • Contact
Reply
WatchingStarredHistory
InboxSent
MembersPros
#Unanswered     #Active
Posts
almiro
9 Posts

Follow

almiro

VIC
Joined 22 October 2011
Junior Member
Send Message
Filter Results
TopicsPostsRecentTitleForum
Posts
almiro
22 August 2020
15
Aug 22, 2020 7:07 pm
Hi Scott, The cost for Hydronic heating I believe depends on the size of the house you're building. Since I'm only building a 38 sq.. the cost is lower. I have my studio appointment on Monday and will find out more. Suffice to say that I know there are 2 towel rails and at least 12 radiators. I orig...
Hi Scott, The cost for Hydronic heating I believe depends on the size of the house you're building. Since I'm only build...
Read PostLike
almiro
8 August 2020
13
Aug 08, 2020 7:07 pm
I'm also building the Vantage and have my M studio appointment end of Aug. I can let you know some costs I've already got: Toilet with concealed cistern - around 1750.00 Square set cornice is done by lineal meter approximately $32 per L/M (Vantage downstairs only about $3K) about 10K for the stairca...
I'm also building the Vantage and have my M studio appointment end of Aug. I can let you know some costs I've already go...
Read PostLike
almiro
8 August 2020
2
Aug 08, 2020 2:43 pm
Hi, Not sure if I can help but I went through something similar in Melbourne. My block has a fall of 1.5m (across the building platform) front to back and orgiinally wanted to build a single storey but the builder was telling me that i needed a substatainal cut and fill (using retaining walls) which...
Hi, Not sure if I can help but I went through something similar in Melbourne. My block has a fall of 1.5m (across the bu...
Read PostLike
almiro
8 August 2020
8
Aug 08, 2020 2:21 pm
Every block (i.e. fall/slope) will be different and require different structural piers and beams to support the structure on challenging building platforms. In my eperience (whether it helps or not) building a split level on a block with a 1.5 meter fall front to back, ended up costing me around $16...
Every block (i.e. fall/slope) will be different and require different structural piers and beams to support the structur...
Read PostLike
almiro
1 June 2020
5
Jun 01, 2020 8:43 pm
You still can attach stuff to Hebel using AAC dowels. That's great then.. was told by Metricon wasn't possible to attached clothes lines, garden hoses, blinds etc.. cheers
That's great then.. was told by Metricon wasn't possible to attached clothes lines, garden hoses, blinds etc.. cheers
Read PostLike
almiro
1 June 2020
3
Jun 01, 2020 8:25 pm
I'm also planning on building the Vantage with a split level design and have opted for the Hebel option on the Lodge facade. The only thing I was concerned about is how the house would look from the street front and asked if I could break the look up a bit with the use of bricks on the pillars, but ...
I'm also planning on building the Vantage with a split level design and have opted for the Hebel option on the Lodge fac...
Read PostLike
almiro
26 February 2012
50
Feb 26, 2012 9:45 am
Hi All, We have started construction with Mainvue; building the Emporio 432, if you are interested in tracking our progress you can check out our blog at http://mainvue.blogspot.com.au/. We started the blog when construction commenced to help document our progress and help others out while building....
Hi All, We have started construction with Mainvue; building the Emporio 432, if you are interested in tracking our progr...
Read PostLike
almiro
23 October 2011
8
Oct 23, 2011 6:55 pm
Hi Edb, Yes, it is good to hear that someone else is building with Mainvue too... The Mainvue electrical contractor contacted us several times directly which is what they said is going to happen. We ended up going with the luxury electrical pack only, although we wanted a few other additional things...
Hi Edb, Yes, it is good to hear that someone else is building with Mainvue too... The Mainvue electrical contractor cont...
Read PostLike
almiro
22 October 2011
6
Oct 22, 2011 9:27 am
Hi all, We are building with Mainvue, signed the contract this week and building in an established area. So far, getting to this stage has taken a bit longer than we expected and there has been a lot of things that needed clarification and after 2 tender appointments and lots of emails we are happy ...
Hi all, We are building with Mainvue, signed the contract this week and building in an established area. So far, getting...
Read PostLike




Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024