Top of my head we are getting an Waffle M. Will double check when I get home.
Browse Forums Building A New House Re: My KDR Metricon Hampshire - Liberty - 45 Melb 325Mar 10, 2017 8:18 pm Geez, I thought my $60k site costs were bad! $90k is definitely up there!! We were given an estimate of $45k and after soil testing it went up. Didn't change after second soil test though. Looks as though the demo is going well Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: My KDR Metricon Hampshire - Liberty - 45 Melb 326Mar 10, 2017 9:13 pm Renman emmyawards Renman what class slab did you have? Top of my head we are getting an Waffle M. Will double check when I get home. I don't think it would be m slab as m is the normal slab. If you have a lot of fill and you need pins cos of neighbours. Sounds more like a p slab. Or maybe even e ? Re: My KDR Metricon Hampshire - Liberty - 45 Melb 327Mar 10, 2017 9:20 pm Renman dulie Mine was only $28k, feels like I got a bargain! Please the next door neighbour built to their boundary we had to spend $11k to underpin it. We are a lot the same. We payed $11,000 as well cos neighbours built on fence line. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 328Mar 10, 2017 9:21 pm Doulton777 Renman dulie Mine was only $28k, feels like I got a bargain! Please the next door neighbour built to their boundary we had to spend $11k to underpin it. We are a lot the same. We payed $11,000 as well cos neighbours built on fence line. We are getting 76 piers. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 329Mar 10, 2017 9:57 pm Renman emmyawards Renman what class slab did you have? Top of my head we are getting an Waffle M. Will double check when I get home. Correction it's a "P" Slab. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 330Mar 10, 2017 11:43 pm Renman dulie Mine was only $28k, feels like I got a bargain! Please the next door neighbour built to their boundary we had to spend $11k to underpin it. But how far are you from their wall? Re: My KDR Metricon Hampshire - Liberty - 45 Melb 331Mar 11, 2017 10:18 am Re: My KDR Metricon Hampshire - Liberty - 45 Melb 334Mar 14, 2017 9:19 am Bet you can't wait to see that slab go up Re: My KDR Metricon Hampshire - Liberty - 45 Melb 335Mar 14, 2017 10:15 am Definitely not long to go. Just gotta get that pesty paperwork out of the way! Re: My KDR Metricon Hampshire - Liberty - 45 Melb 336Mar 14, 2017 11:50 am dulie Definitely not long to go. Just gotta get that pesty paperwork out of the way! Still making variations changes lol. Hoping that the build happens from April and it doesn't have too much rain. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 337Mar 14, 2017 11:53 am Renman dulie Definitely not long to go. Just gotta get that pesty paperwork out of the way! Still making variations changes lol. Hoping that the build happens from April and it doesn't have too much rain. I'm sure you'll still make more variations even after you think you're all done and signed. There's always something missing/not right! lol Re: My KDR Metricon Hampshire - Liberty - 45 Melb 338Mar 14, 2017 11:57 am dulie Renman dulie Definitely not long to go. Just gotta get that pesty paperwork out of the way! Still making variations changes lol. Hoping that the build happens from April and it doesn't have too much rain. I'm sure you'll still make more variations even after you think you're all done and signed. There's always something missing/not right! lol I just don't want to me paying admin fees Re: My KDR Metricon Hampshire - Liberty - 45 Melb 339Mar 14, 2017 12:07 pm Renman dulie Renman [quote="dulie"]Definitely not long to go. Just gotta get that pesty paperwork out of the way! Still making variations changes lol. Hoping that the build happens from April and it doesn't have too much rain. I'm sure you'll still make more variations even after you think you're all done and signed. There's always something missing/not right! lol I just don't want to me paying admin fees [/quote] Just think about the zeros it will add Re: My KDR Metricon Hampshire - Liberty - 45 Melb 340Mar 14, 2017 6:18 pm Doulton777 Renman dulie [quote="Renman"][quote="dulie"]Definitely not long to go. Just gotta get that pesty paperwork out of the way! Still making variations changes lol. Hoping that the build happens from April and it doesn't have too much rain. I'm sure you'll still make more variations even after you think you're all done and signed. There's always something missing/not right! lol I just don't want to me paying admin fees [/quote] Just think about the zeros it will add [/quote] Don't laugh D777, M is add more zeros than I can afford. We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37085 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 18897 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13437 |