Browse Forums Building A New House Re: Mojo Homes 215May 24, 2016 3:37 pm For those that have done electrical appointment, how much to allow over base costs, if you stay sensible architect, blogger at homedesignedge.com, Spacesave.co and author of Guide to Planning and Building a Home on a Budget Re: Mojo Homes 216May 25, 2016 6:38 pm Maccy_73 My suggestion is to start the process with mojo ASAP. It took us a good 12 mths to get to construction phase. If you have minimal changes you might be a chance to start early next year when you're land registers but i certainly don't think it's too early if you're decision is to go with Mojo. As for inclusions im.not sure I'm good to answer. We made loads of changes and did a lot of upgrades, so our build cost is close to double.... but until you pay the $3k and get a site report i don't think that you will get a true idea of the site costs or slab required. I don't recall the cost for rain tank, might have been $10k??? Best of luck with your decision... as you have rightly pointed out there is no "perfect builder"... i hope this time around is a better experience than your last tho. HI Macey_73. sorry to butt in on your post, if you were over 12month to get to construction stage did your tender period expired? were you hit with this as an extra cost? Re: Mojo Homes 217May 25, 2016 9:27 pm amanda_j81 Maccy_73 My suggestion is to start the process with mojo ASAP. It took us a good 12 mths to get to construction phase. If you have minimal changes you might be a chance to start early next year when you're land registers but i certainly don't think it's too early if you're decision is to go with Mojo. As for inclusions im.not sure I'm good to answer. We made loads of changes and did a lot of upgrades, so our build cost is close to double.... but until you pay the $3k and get a site report i don't think that you will get a true idea of the site costs or slab required. I don't recall the cost for rain tank, might have been $10k??? Best of luck with your decision... as you have rightly pointed out there is no "perfect builder"... i hope this time around is a better experience than your last tho. HI Macey_73. sorry to butt in on your post, if you were over 12month to get to construction stage did your tender period expired? were you hit with this as an extra cost? Yes we did have to pay extra for an extension but we negotiated on the cost they wanted to charge us because most of the delays were their end. Re: Mojo Homes 220May 31, 2016 1:08 pm We did do lots of changes but often not all changes would be reflected is the variation. The was lots of to and fro. And often weeks would go by with no contact. And then we had to wait two months or so for the colour appointment. Just all adds up to about three months of delays. Is anyone building with Mojo and have a recent site cost tender 0 15929 Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13107 Hi, We are looking for a builder that can build a small home (smaller length) on a sloping site. We came across Mojo's Zephyr design 10.6 m wide and 11.5 m length. Does… 0 22925 |