Browse Forums Building A New House Re: Who's building with Clarendon?? 88Sep 20, 2011 11:19 pm Electrical - Automation - Smart wiring - New homes - Commercial - Data cabling] 1300 050 315 www.cenemelectrical.com.au www.facebook.com/cenemelectrical Re: Who's building with Clarendon?? 92Sep 25, 2011 12:39 am My Build:https://forum.homeone.com.au/viewtopic.php?f=31&t=50541&p=772361#p772361 site start: 24/8/11 slab: 5/9/11 frame: 21/11/11 lock-up: 6/6/12 Re: Who's building with Clarendon?? 94Sep 25, 2011 7:49 pm My Build:https://forum.homeone.com.au/viewtopic.php?f=31&t=50541&p=772361#p772361 site start: 24/8/11 slab: 5/9/11 frame: 21/11/11 lock-up: 6/6/12 Re: Who's building with Clarendon?? 97Oct 21, 2011 9:51 am commando007 Ok we are just doing our externals and I was wondering what people have done with their air conditioner. Ie upgrades zoning etc. Thanks Hi commando; we went with the internal guys; but we upgraded the controller upstairs, added another zone & added some better filter thing. Costed around $14,600 + we had to pay them $1000 or so for the better controller + filter. Depends on what house you build but if you wanted just the vents etc I think it was $5k. Re: Who's building with Clarendon?? 98Oct 21, 2011 10:38 am rjg commando007 Ok we are just doing our externals and I was wondering what people have done with their air conditioner. Ie upgrades zoning etc. Thanks Hi commando; we went with the internal guys; but we upgraded the controller upstairs, added another zone & added some better filter thing. Costed around $14,600 + we had to pay them $1000 or so for the better controller + filter. Depends on what house you build but if you wanted just the vents etc I think it was $5k. Great thanks, I think we will do similar. Re: Who's building with Clarendon?? 99Oct 21, 2011 11:07 am I just upgraded the unit given during negotiations. Interestingly enough, the guys are doing the rough in for the airconditioning unit today. I didn't have a vent in the laundry (which is good for the middle of winter to hang up clothes on an air dryer), so I got the intallation company to put an extra one in, rather than a variation. My Build:https://forum.homeone.com.au/viewtopic.php?f=31&t=50541&p=772361#p772361 site start: 24/8/11 slab: 5/9/11 frame: 21/11/11 lock-up: 6/6/12 Re: Who's building with Clarendon?? 100Oct 25, 2011 4:24 pm Hi Everyone, we are seriously considering building with Clarendon in the Sutherland Shire, we've paid the $1000 deposit for the tender, just wondering if anyone has any advice before we sign on the dotted line. Regards Bec the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6747 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 7872 |