Hi All, We have just put a holding deposit on one of the land lots in the upcoming Heartlands Estate in Tarneit VIC, but still confused if we have made the right decision.
So, just wondering what are everyone's opinions on the suburb or the estate?
Browse Forums Buying Land Re: Heartlands Estate, Tarneit VIC 10Mar 21, 2011 3:08 pm MetroNest Homes 36sq Land contract- 26/02/15 Build Contract - 30/10/15 Settlement - 01/06/2016 Site Start - 29/09/2016 Build Handover - 14/07/2017 Re: Heartlands Estate, Tarneit VIC 12Mar 22, 2011 1:43 pm MetroNest Homes 36sq Land contract- 26/02/15 Build Contract - 30/10/15 Settlement - 01/06/2016 Site Start - 29/09/2016 Build Handover - 14/07/2017 Re: Heartlands Estate, Tarneit VIC 14Mar 22, 2011 4:48 pm MetroNest Homes 36sq Land contract- 26/02/15 Build Contract - 30/10/15 Settlement - 01/06/2016 Site Start - 29/09/2016 Build Handover - 14/07/2017 Re: Heartlands Estate, Tarneit VIC 16Mar 29, 2011 10:29 am jitendrasharma Hi There, We have bought a land in Stage 8b and we are building with Simonds. Land settlement expected in June/July Silly question, but have they relaxed the estate guideliness at all with stage 8 ? Cause we gotta have full front rendering on the house.. what about u guys ? Re: Heartlands Estate, Tarneit VIC 17Mar 29, 2011 10:38 am Not sure, think rendered pillar is mandatory but I am getting the front rendered. Any news on your titles? MetroNest Homes 36sq Land contract- 26/02/15 Build Contract - 30/10/15 Settlement - 01/06/2016 Site Start - 29/09/2016 Build Handover - 14/07/2017 Re: Heartlands Estate, Tarneit VIC 18Mar 29, 2011 10:59 am jitendrasharma Not sure, think rendered pillar is mandatory but I am getting the front rendered. Any news on your titles? Estate design guidelines for our block states; The external face of any wall that has a street frontage must be constructed with approved cement rendered finish which is also applied to an area on each intersecting side wall of not less than 1 meter in width and covering the entire vertical height of such side wall for that 1 meter width. Check what ur design guidelines say in the section 32 document (Point 1.6 in our doco). Titles have been delayed.. they are saying May end or early June.. Re: Heartlands Estate, Tarneit VIC 19Apr 19, 2011 9:45 am Finally got on here, we are building in The Heartlands Tarneit too in stage 1b. Just got the newsletter which now says land title in Mid June. oh well more time to save. Just wondered who else got the newsletter as I had to chase them for it? Yes it is full front render. We have design approval and building a Lexington q3. Re: Heartlands Estate, Tarneit VIC 20Apr 19, 2011 1:28 pm haven't got any newsletter so far, may be because I am in stage 8a. Spoke to the sales office they said the titles are expected in early July for us. MetroNest Homes 36sq Land contract- 26/02/15 Build Contract - 30/10/15 Settlement - 01/06/2016 Site Start - 29/09/2016 Build Handover - 14/07/2017 I have posted this before: We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports… 2 1933 |