Building Forum » Building, Renovation & Maintenance » Building A New House

Carlswil's Statesman Tusmore - front yard pics

New Topic Post Reply  Page 1 of 87
 [ 1724 posts ]  Go to page 1, 2, 3, 4, 5 ... 87 Next
  Print view Previous topic | Next topic 
Author Message
carlswil
 Post subject: Carlswil's Statesman Tusmore - front yard pics
PostPosted: Jul 13, 2010 11:42 am 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
I've been hanging around on here reading about everyone else's builds and admiring their pictures, for the last few months. It appears that something may happen with ours shortly, so I figured it was time to start my own thread.

My boyfriend and I are building a house with Statesman Homes in SA. In November 09 we placed a hold on a block of land that was owned by our builder, and signed the building contract. We signed the land contract in December 09 and were told that land settlement should be in February 10.

By early February, we had received the master plan and construction footings report back, and the application went to council. No sign of land settlement yet.

We did colour selections early April. By mid April we started contacting the builder about council approval. We had been told it would take between 6 and 12 weeks, and we were already 10 weeks into it. After numerous emails to client liaison, with no response, I contacted the council direct. They advised that the land hadn't been subdivided yet, and until that had happened, they wouldn't even look at our application.

Anyway after months of waiting, on 30 June we finally got council approval. Land settlement is booked for tomorrow. It seems like we might actually be getting somewhere.

I will put our plan up when I work out how to.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Last edited by carlswil on Mar 18, 2011 8:34 am, edited 51 times in total.

Top
 Profile  
stegosaurus
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 12:14 pm 
Offline
Silver Member
Silver Member

Joined: 16 Feb 2010
Posts: 317
Location: Adelaide
Hi Carlswil

Congratulations on your approval - and on starting your own thread!

Look forward to seeing your plans and selections :)

_________________
Stegosaurus
viewtopic.php?f=31&t=31715


Top
 Profile  
robinred55
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 3:17 pm 
Offline
Gold Member
Gold Member

Joined: 18 Jan 2010
Posts: 996
Location: Adelaide
Hi Carlswil, congrats on your thread and hopefully your ok to start.

_________________
Handover February 2011
Happy with our home


Top
 Profile  
Lucene
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 5:03 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 20 Apr 2010
Posts: 1378
Location: Mount Barker
Hi Carlswil congratulations also on your settlement I hope all goes well. I will be following your thread as we have settlement in a couple of weeks also. Goodluck. ::

_________________
Contracts signed Dec 09
OK to Start Sep 17
Slab Oct 6
Frame Oct 25,26
Windows and Gutters Oct 28
Bricks Nov 2 -20
Roof Finished Nov 10
Insulation and Gyprock Finished Nov 30
Locked Out Dec 13
Cupboards Installed Dec 17
Tile prep work Dec 26
Painter started Dec 30
Stormwater Jan 17
Tiles Jan 10-19
PCI Feb 2
Handover Feb 9

viewtopic.php?f=31&t=37120[size=85]


Top
 Profile  
all the sand
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 5:10 pm 
Offline
Gold Member
Gold Member

Joined: 26 Aug 2009
Posts: 540
Hi Carlswil,
YAY for starting your own thread. Excellent news on the settlement.
Cant wait to see your plan and colours etc.
Who was your sales consultant?
V


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 6:24 pm 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
Thanks Stegosaurus and Robinred. I'll put the floor plan up in a minute.

Lucene wrote:
Hi Carlswil congratulations also on your settlement I hope all goes well. I will be following your thread as we have settlement in a couple of weeks also. Goodluck. ::


Thanks Lucene. Goodluck with your settlement. Hope it goes well and they start soon after.

Thanks All the Sand. Our sales consultant was Bill Harding. We thought he was fantastic.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 6:28 pm 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
Here's our plan. We only made one change to it. Originally the 3rd bedroom was a bedroom and study, but both were really small, so we combined the 2 rooms. It will make a pretty big room, but I'm sure we can make use of it.

[ img ]

I don't really know what I'm doing, so I hope this attachment worked.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 13, 2010 6:31 pm 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
We got our letter today, to apply for the extension for the FHOG. They have said that they won't give us an ok to start date until the extension has been approved. I'm hoping it doesn't take too long. They have also put in the letter that the estimated slab pour date is 4th October. This had better be worst case scenario, because I'm not patient enough to sit around for the next 3 months with nothing happening.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
stegosaurus
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 14, 2010 9:14 am 
Offline
Silver Member
Silver Member

Joined: 16 Feb 2010
Posts: 317
Location: Adelaide
Nice plan Carlswil! 3 living spaces! Wow! Start buying furniture :lol:

Totally agree that Bed 3 would have been way too small if it was divided into 2 rooms.

How big is your block of land?

Hope you don't have to wait till October for the slab.

_________________
Stegosaurus
viewtopic.php?f=31&t=31715


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore
PostPosted: Jul 14, 2010 10:56 am 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
We definately need to buy furniture, but we don't have anywhere to put it just yet. It'll be so nice to start shopping for house things.

Our block is 534 m2

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore - Land settlement done
PostPosted: Jul 15, 2010 11:06 am 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
We sent our application off to Revenue SA to get an extension on the FHOG 26 week criteria. Hopefully it doesn't take them to long to assess it.

Here are some of our colour selections. I'll put pictures up of some things, once I've charged my camera. I hope it all comes together ok, i'm a little concerned about how things are going to look.

Exterior:
tiles - Boral shadow grey
bricks - Austral Settlers grey
gutters, downpipes, window frames - paperbark
Roller doors - wilderness
front door - I think wilderness, but can't really remember

Interior:
Kitchen bench - Vulcan stone. We couldn't afford to upgrade, so went with the standard range. I really wanted gloss, but the colour selections lady talked us out of it. I've pretty well regretted that ever since, but worst case if we hate it, we'll change it once we're in

Cupboards - Rock Salt. I'm not sure about these, and haven't seen any pictures on here of them.

I can't remember what we chose for the laundry, bathroom and ensuite. I'll update this when I know.

Paint colour - First Snow. We wanted a neutral colour. I wish we could change it now. We were looking at a display home on the weekend with grey walls (not light grey), and it looked really good.

I wasn't overly pleased with the tile selections we were given. I think we more chose what we disliked the least, rather than what we liked.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
cous1981
 Post subject: Re: Carlswil's Statesman Tusmore - Land settlement done
PostPosted: Jul 15, 2010 11:22 am 
Offline
Gold Member
Gold Member

Joined: 08 Sep 2009
Posts: 492
Hi carlswil, great to see you have started your own thread. Congratulations on settlement.
I love your house plan :: and am looking forward to seeing samples of the colours you have chosen.
What a pain if you have to wait until October for a slab, that would drive me insane knowing that the land was ready to go. Fingers crossed it gets brought forward for you.

_________________
My Building Thread


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore - Land settlement done
PostPosted: Jul 15, 2010 11:37 am 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
Thanks Cous1981
I think the builder is waiting for the FHOG extension to be approved (not that this is relevant to them, but they think it is), and then we'll be released to construction. Hopefully this happens soon. I'm not a patient person and I'm sick of waiting.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
cous1981
 Post subject: Re: Carlswil's Statesman Tusmore - Land settlement done
PostPosted: Jul 15, 2010 11:46 am 
Offline
Gold Member
Gold Member

Joined: 08 Sep 2009
Posts: 492
I am exactly the same, I feel for you.

_________________
My Building Thread


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore - getting close
PostPosted: Jul 19, 2010 3:12 pm 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
Heard from the builder today, they will release us to construction on Friday. Finally seems like something might actually happen. Hopefully we don't have to wait too long until they go to site.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
hoffdog
 Post subject: Re: Carlswil's Statesman Tusmore - getting close
PostPosted: Jul 19, 2010 3:26 pm 
Offline
Gold Member
Gold Member

Joined: 25 Jun 2009
Posts: 476
Nice plan, have been through this house before, its a good design, furnishing is the fun part.
Good luck with starting construction, its a very exciting time.


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore - getting close
PostPosted: Jul 20, 2010 11:03 pm 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
We got a letter from Revenue SA today. Our FHOG extension has been granted. That didn't take them very long to approve. When I spoke to them yesterday, they said it would be 2 - 3 weeks before we got a response.

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
cous1981
 Post subject: Re: Carlswil's Statesman Tusmore - FHOG extension granted
PostPosted: Jul 21, 2010 8:58 am 
Offline
Gold Member
Gold Member

Joined: 08 Sep 2009
Posts: 492
YAY Congratulations

_________________
My Building Thread


Top
 Profile  
Lucene
 Post subject: Re: Carlswil's Statesman Tusmore - FHOG extension granted
PostPosted: Jul 21, 2010 2:15 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 20 Apr 2010
Posts: 1378
Location: Mount Barker
Congratulations! I hope things really start to speed up for you now! I will be watching ::smile::

_________________
Contracts signed Dec 09
OK to Start Sep 17
Slab Oct 6
Frame Oct 25,26
Windows and Gutters Oct 28
Bricks Nov 2 -20
Roof Finished Nov 10
Insulation and Gyprock Finished Nov 30
Locked Out Dec 13
Cupboards Installed Dec 17
Tile prep work Dec 26
Painter started Dec 30
Stormwater Jan 17
Tiles Jan 10-19
PCI Feb 2
Handover Feb 9

viewtopic.php?f=31&t=37120[size=85]


Top
 Profile  
carlswil
 Post subject: Re: Carlswil's Statesman Tusmore - FHOG extension granted
PostPosted: Jul 21, 2010 2:17 pm 
Offline
Gold Member
Gold Member

Joined: 16 Apr 2010
Posts: 2653
Thanks Cous and Lucene. I hope things speed up too. As soon as there is some movement at my block, I will take pics and put them up. Now that will be exciting (well for me anyway)

_________________
contract signed: Nov 09
Released to Construction: 23 Jul 10
Slab poured: 9 Aug 10
Frame completed: 30 Aug 10
Windows & Gutters: 7 Sep 10
Bricks: 15 - 23 Sep 10
Roof: 24 Sep 10
Gyprock: 20 Oct 10
Lockup: 25 Oct 10
Kitchen: 27 Oct 10
Tiling: 6 - 9 Nov 10
Painting: 17 Nov 10
Carpet: 30 Nov 10
PCI: 15 Dec 10
Handover: 17 Dec 10


http://forum.homeone.com.au/viewtopic.php?f=31&t=35943


Top
 Profile  
Sort by  
New Topic Post Reply  Page 1 of 87
 [ 1724 posts ]  Go to page 1, 2, 3, 4, 5 ... 87 Next

Building Forum » Building, Renovation & Maintenance » Building A New House



Who is online

Users browsing this forum: Budorat, catjim, Cody Drysdale, Davelle, Kroe, LittleJ, Mrs Brown Bear, Ricaaaa, southbank, SuttoMacca, Vess, waxinggibbous and 39 guests



Search for:



Subscribe

May 2013 Specials

2 x Espresso Table Lamps4 days leftBy Go Lights NSW
These stunning Espresso table lamps from Cafe Lighting are perfect for the bedroom or the living room. 2 of these lamps for less than $40...read more
10% off for the whole of MAY5 days leftBy SQUAREpeg - Moving Specialists VIC
Since you have the huge decision of choosing who to move with we feel it will make your life easier if we give you 10%...read more
Free Gift for all Homeone Customers5 days leftBy The Round Bath Company WA
Purchase any of our Spas from our huge range on Ebay this month, mention HOMEONE and receive a free gift with your first purchase. To...read more
Winter Rug Clearance Catalogue 11 days leftBy Harvey Norman The Carpet and Flooring Specialists ACT
Save, save, save with modern rugs, traditional rugs, shaggy rugs, wool rugs acrylic rugs and polypropylene rugs! There are many colours and designs to choose...read more
10% off 18 days leftBy PR Painting QLD
Receive up to 105 off your next Brisbane painting quote when you mention this advert...read more

Articles

Read Article: Interior Design Gets Set for Winter by Dale Alcock Homes WAInterior Design Gets Set for Winter
As the winter chill sets in, we thought now would be…
Read Article: FAQFAQ's - Onlinecarpet.com.au
Does OnlineCarpet install? Yes, OnlineCarpet will install your carpet. We are a…
Read Article: Modular Wall Systems wins Industrial Product of the year and Steel Innovation of the year Awards by Modular Wall Systems VICModular Wall Systems wins Industrial Product of the year and Steel Innovation of the year Awards
The industry leading supplier of stylish, cost-effective acoustic & boundary walls…
Read Article: Solar Energy FAQ by Go Lights NSWSolar Energy FAQ
Complete and comprehensive Solar Energy and lighting FAQ
Read Article: Outdoor Lighting Glossary by Go Lights NSWOutdoor Lighting Glossary
A description of the popular types of outdoor lighting

Videos

Watch Video: The Archipelago II by Dale Alcock Homes WAThe Archipelago II
The sequel of our most popular home design, the Archipelago. For…
Watch Video: Timber Pest Inspections by Resicert Property Inspections WATimber Pest Inspections
Resicert Timber Pest Inspections - Brilliant Inspections, Best Reports, Fast!
Watch Video: The Marrakech by Dale Alcock Homes WAThe Marrakech
Built with relaxation and flexibility in mind, the Marrakech means you'll…
homeone® - Australia's home building and renovation resource.  home building and renovation forum
Jump to: 


All posts made to these forums express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
Forum FAQ | Members | Forum Terms of Use | Site Terms of Use | Privacy

homeone.com.au logos, designs, layout, page headers and colour scheme are ® Copyright Homeone Australia & New Zealand 2001-2013 (v3.0)
homeone® is a registered trademark. All rights reserved. ABN 46 625 367 703.