I'm just wondering what the maximum tolerance is for bricks to be over the edge beam as in some places on my house that is just being bricked up it is upto 15-20mm. Is this ok?
Also the bricks went up 20 days after the slab was poured. I thought 28 days was the normal minimum curing time.