Browse Forums Building A New House Re: Masterton Homes Hydraulics 2Mar 29, 2024 10:46 pm We are Expert Consultant's, and we are here to help. Re: Masterton Homes Hydraulics 4Mar 31, 2024 7:01 pm P is a site classification (Problem) it could be trees, fill, all sorts of things. The reactivity of the soils brought in will probably equal a H1 or H2 (2 most likely). The fill automatically triggers Clause 5.6 (but any builders earthworks actually triggers 5.6). The fill should be laid down as controlled. 150mm fill, water, vibrate roll, 150mm fill, water, vibrate roll, etc etc. This is called controlled Fill. If this is done you can have a field density test on each 500mm rise confirming a minimum of 92%, which negate the requirement for piers. We are Expert Consultant's, and we are here to help. I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 108653 Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 26169 Hi, I am wondering if anyone has built with Montgomery in the last few years on the Northern Beaches? I don't see the see them around, as I would love to ask how happy… 0 3388 |