Browse Forums Building A New House Re: Who is building with Beechwood 14757Apr 17, 2017 6:42 pm tapasr_Lexia4 newb Hi yes they are standard but if you want them in the 1/3 pattern then you have to pay extra so I don't think of them as standard as I personally would not have them stacked as a floor tile. Thanks for the welcome, yes we are almost at the same stage i think you have been just ahead of me so far. I have already put extra power points in each of the bedrooms as we only have one now and its not enough, plus one extra in the kitchen. Its so hard to know what to put in ive got my plan sitting on my coffee table with the extra electrical i am thinking of and just keep checking over it every time i sit down lol. How much extra are we talking about newb? Our electrical appointment is on the 27th so unless our other mates here can give us any info as to what they have done or what they could have done then that whittled be great for us who are just about to ink and finalise our electricals then that would be great http://buildingourhumblehome.blogspot.com Land Deposit - 20.08.2016 Land Registered - 27.09.2016 Land Settlement - 07.11.2016 House Deposit - 27.11.2016 House Contracts - 16.02.2017 House Build Starts - 10.04.2017 Building with Beechwood Homes Some of the other things we did at electrical Lights down the side of the house Extra circuits for power ( allows splitting later) Smoke alarm on standalone circuit (as fire fighters we go to many houses with hard wired smoke alarm and the only thing you can do is turn the light circuit off then you got no lights till they fixed) Sensor activated lights out the front facade Data points (hills home hub wasn't worth it for us) 2 & 3 way switching in certian areas Outside power points SPA circuits Tv points Phone points as well as lead in inside main power trench Extra light points Power in Re: Who is building with Beechwood 14758Apr 17, 2017 6:49 pm Does that mean two way switches aren't standard? Re: Who is building with Beechwood 14760Apr 17, 2017 7:53 pm Thanks Tom for always answerIng our question...you are a legend !!! http://buildingourhumblehome.blogspot.com Land Deposit - 20.08.2016 Land Registered - 27.09.2016 Land Settlement - 07.11.2016 House Deposit - 27.11.2016 House Contracts - 16.02.2017 House Build Starts - 10.04.2017 Building with Beechwood Homes buildingourhumblehome.blogspot.com.au I do enjoy the drama:-D In his latest two videos he has started bringing security guards to site, I am waiting for the punch on to begin lol 6 46109 Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11517 |