Browse Forums Building A New House Re: Mojo Homes 931Apr 01, 2017 11:44 am Sounds good. We have reserve behind so hopefully council will let us use for access. 60k for all that seems reasonable. Can't wait to get one of I didn't have a crappie small home now I would do it before the build. Mojo didnt allow us to add a p trap on the side of the house for the sewer which would have made life easier when we were connecting the overflow. Re: Mojo Homes 932Apr 11, 2017 11:38 pm aside from this crazy weather did you all know April has 17 working days PLUS one of those is an RDO. This makes supervisors like myself go crazy hahahah bring on may to november. Busiest and most productive part of the year! Dont know if ive mentioned it but increasing garage door height to 2400mm is a relatively cheap option at tender time (600ish). Lots of bigger SUVs plus roofracks doesnt leave much space!! Re: Mojo Homes 934Apr 24, 2017 7:01 pm we are still waiting for our contract and final plans... a bit stressed here as everything is just pending this contract and final plans. We've had our electrical already and our tender period expires next month.... Hope weather holds up for you! Re: Mojo Homes 935Apr 24, 2017 9:16 pm Hi all, Havent posted for awhile. So we finally got our keys back on the 10th of feb. There was just handfull of stuff to be done on the practical completion date. Still not completed up to date! Havent been able to connect cable since we moved in because the cable line wasnt pull through from the street? They had a technician out to fix the problem then we called Optus to come out again to install and Mojo only connected ADSL line through?not NBN... 😣 its so frustrating! Re: Mojo Homes 936Apr 25, 2017 11:22 am happychild123 we are still waiting for our contract and final plans... a bit stressed here as everything is just pending this contract and final plans. We've had our electrical already and our tender period expires next month.... Hope weather holds up for you! Not trying to stress you but Council da, cc to construction list will take approx 2 months from when they submit. Mine was jan 25th and was put on construction list march 30th. Looks like you will go over your tender expiry. Re: Mojo Homes 937Apr 26, 2017 7:27 pm ja-mez happychild123 we are still waiting for our contract and final plans... a bit stressed here as everything is just pending this contract and final plans. We've had our electrical already and our tender period expires next month.... Hope weather holds up for you! Not trying to stress you but Council da, cc to construction list will take approx 2 months from when they submit. Mine was jan 25th and was put on construction list march 30th. Looks like you will go over your tender expiry. Doesn't that depend on the council and doesn't it speed up if it's CDC? Re: Mojo Homes 939Apr 26, 2017 8:31 pm ja-mez 2 months is normal for that process. As for cdc take out the council portion and its only 3 weeks of the 9 it took. Add the cdc time youre still at 7 or 8 weeks..... So much for moving in before Christmas 😐 Re: Mojo Homes 940Apr 28, 2017 7:52 am Crownleyian ja-mez 2 months is normal for that process. As for cdc take out the council portion and its only 3 weeks of the 9 it took. Add the cdc time youre still at 7 or 8 weeks..... So much for moving in before Christmas Do you think? What was the construction period for you? Plus weather impacts not counted in the calculation Is anyone building with Mojo and have a recent site cost tender 0 16136 Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13372 Hi, We are looking for a builder that can build a small home (smaller length) on a sloping site. We came across Mojo's Zephyr design 10.6 m wide and 11.5 m length. Does… 0 23293 |